Acme BioPed is a manufacturer of custom orthotics, partnering with Chiropractors and Podiatrists to provide custom orthotics for a range of medical issues related to foot care. Located just north of a major urban center. The manufacturing plant is open from 8:00 to 4:305 days per week.
Process Overview
The manufacturing plant (lab) consists of 4 production lines with 10 staff per line. The first part of the process involves applying the logo to the top cover. Approximately 60% of orders require a personal top cover. The next step involves picking material for all orders, then the technicians machine the base of the orthotic. From the technicians, the order is scanned into 1 of the production cells which produce the orthotic. Quality control inspects the product before shipping picks it up and processes the order for shipping.
Customer Information
The organization receives orders from over 2000 health care practitioners on a yearly basis. Each practitioner can have between 1 order to 100 per year. Approximately 500 to 600 orders are received daily through the customer service department. However, during peak orders can reach 1000 per day. Assumer there are 20 working days per month.
Since custom orthotics are covered via health plans, customers tend to order towards the end of their coverage year. So, the peak demand months are June and July, with the main push towards the end of the year. See the demand table below.
Month Demand
January 9,820
February 9,980
March 10,100
April 10,235
May 10,654
June 12,894
July 11,465
August 8,263
September 14,682
October 16,234
November 18,756
December 17,549
Orders for custom orthotics are received via the Gaitscan system with an electronic scan of the customers foot, or via the mail with a box containing the foam imprint of the customers foot. The customer service department processes the paper work and ensures that the order includes the necessary information need for the manufacturing processes. Acme BioPed ships daily to customers, health practitioners as the order is completed.
Supplier Information
Raw materials are shipped from two suppliers on a weekly basis based upon the forecasted demand. Once processed by receiving, the material handlers provides the inventory to the Material Picker in production.
Manufacturing Lab
The production steps are outlined below in the next sections.
Personal Top Cover
There are two production staff in this area that run 2 machines. The big machine can process 10 topcovers (5 human feet) at a time and takes 3 minutes to run while the small machine can process 6 topcovers (3 human feet) at a time and takes 2 minutes to run. The operators also performs the following tasks:
Walks outside the printing room to pick up orders
Puts orders on trolley inside the room
Sorts the orders by date
Carries the order in batches based upon the machine size e.g. large, small
Preps the files on the computer
Takes the completed top covers off the machine
marries the top covers to the baskets containing the orders
Preps the machine for the new orders
Presses button to run the machine
Carries finished orders to cart
Materials Picker
Pulls cart from behind station picking area
Picks materials needed for each order and places in basket
The materials picker is interrupted often, with production staff asking questions about which material is in the basket or getting the correct material or getting additional material
Cycle time =2 minutes 37 seconds
Scanner
The scanner scans the order into the technician area and sorts and organizes the orders for each technician. She places the orders (baskets) in roughly batches of 10 each per technician. Inventory at this point can be high as the orders wait for the technicians to machine.
Cycle time =35 seconds
Technicians
There are 6 technicians that machine the base of the orthotic, 1 is male and 5 are female. 3 of the technicians are experienced and 2 are have moderate experience and 1 technician is brand new. Each technician walks to the trolley to pick up a batch of 10 to 12 baskets and then walks back to their work station. At each work station there are 3 types of machines (flat grinder used 20% of the time, grinder, finishing grinder) that are required to machine the base of the orthotic. The technicians, while they do the same thing dont follow the same process to complete their work. Some produce up to 100 per day while others are only producing 70 per day.
This operation has been deemed a bottleneck and used to be in the production line. It was moved to in front of production to achieve a smoother flow, however, the technicians are still producing approximately only 500 to 580 per day.
Key Tasks
Walk to rack to pick up batch of 10
Walk back to work station
Sort baskets by type (diabetic,
If diabetic or com

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management

Authors: Chuck Williams

4th Edition

978-0324316797, 0324316798

More Books

Students also viewed these General Management questions