Question
1 Approved Answer
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 90,000 270,000 Prime costs $8,100,000 $30,240,000 $38,340,000 Machine hours 90,000 450,000 540,000 Engineering hours 500 4,500 5,000 Receiving orders 200 600 800 Inspection hours 800 1,600 2,400 Overhead costs: Machining $4,860,000 Engineering 2,600,000 Receiving 264,000 Inspecting products 288,000 Required: 1. Calculate the four activity rates. Machining rate per machine hour Engineering rate $ per hour Receiving rate $ per order Required: 1. Calculate the four activity rates. Machining rate $ per machine hour Engineering rate $ per hour Receiving rate $ per order Inspecting rate per hour 2. Calculate the unit costs using activity rates. Round your answers to the nearest cent. Unit cost Basic per unit Advanced per unit Calculate the overhead cost per unit. Round your answers to the nearest cent. Overhead Cost Basic per unit Advanced per unit 3. If consumption ratios instead of activity rates were used to assign costs instead of activity rates, show the cost assignment for the inspection activity. Cost assignment Basic Advanced Feedback Check My Work 1. Machining rate: Overhead costs - Total machine hours. The other three activity rates are calculated the same way using each activity's Overhead costs and totals. 2. Use the calculations from Requirement 1 to calculate the unit costs and also calculate OH cost per unit. Example of Total cost: Activity rate (above) x Basic OH costs and also Activity rate x Advanced OH costs. Example of OH costs per units: Total manufacturing costs: Units of production = Unit Cost (for Basic and Advanced). 3. Calculate unit costs using consumption ratios. Compare to activity rate unit costs. To assign inspection cost use the inspection hrs. for basic/advanced = total inspection hrs. for both and give a conclusion
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started