Question
After drilling the intermediate section of a wellbore to 9,000 ft TVD, completing the casing running and cementing operations, the same mud system is going
After drilling the intermediate section of a wellbore to 9,000 ft TVD, completing the casing running and cementing operations, the same mud system is going to used to drill the next hole section. However, the density of the water-based mud must increase from 11 ppg to 12.5 ppg while the total mud volume needs to remained constant, 800 bbl. The solid concentration, solid = 13.8 ppg, in the current mud is 6% and needs to be lowered to 3% in the new mud system.
How much water is required to complete the task?
How much mud needs to be discarded?
What is the density of water in the downhole condition if the surface temperature and the geothermal gradient are
70F and 0.01 F/ft, respectively?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started