ALLVity-ased costing and Conventional Costs Compared Hickory Grill Company manufactures two types of cooking grille: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops the Smoker is sold in major discount stores. Following is Information pertaining to the manufacturing costs for the current month. Gas Cooker Charcoal Smoker Units 1,000 5.000 Number of batches 50 10 Number of batch moves 20 Direct materials 160,000 $120.000 Direct labor 120,000 525.000 HO Manufacturing overhead follows: Activity Cost Cost Driver Materials acquisition and inspection 350.300 Amount of direct material con Materal movement 16,200 Number of batch moves Scheduling 36.000 Number of batches S102.000 a. Determine the total and per-unit costs of manufacturing the Gas Cooker and Charcoal Smoker for the month assuming all manufacturing overhead is assigned on the basis of direct labor dollars. Round rate to four decimal places, if applicable. Manufacturing overhead based on dire labor dollars per direct labor dollar Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number when needed. Round cost per unit to two decimal places. If needed Product Costs per Unit Gas Cooker Charcoal Smoker Direct me 1 05 Manutacturing overheid 0 O 03 D 0 5 0 Manutacturing overhead Total.com Units Cost per un 03 0 01 0 b. Determine the total and per-unit costs of manufacturing the Gas Cooker and Charcoal Smoker for the month, assuming manufacturing overhead is assigned using activity-based costing Round answers to two decimal place. if needed Activity based overhead rates Materials acquisition and handling 5 0 per direct material dollar Materials movemento per move Scheduling 50 per batch Use rounded overhead rate calculated above for calculations belowRound cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed Product Costs per Unit Gas Cooker Charcoal Smoker Dream OS Det labor 0 0 Manufacturing over Materac 0 0 Material movement O 0 Scheduing 0 Total cost perbach 5 OS 0 Number of units per batch Content 1 05