APPLY THE CONCEPTS: Complete the job cost sheets for In the Doghouse Company In the Doghouse Company builds doghouses. They have three sizes: small, medium
-
APPLY THE CONCEPTS: Complete the job cost sheets for In the Doghouse Company
In the Doghouse Company builds doghouses. They have three sizes: small, medium and large. Each size can be built in one of two styles, standard or deluxe. All doghouses are built with treated lumber and have shingled roofs. The deluxe model is insulated and has a covered porch. In the Doghouse sells mostly to local hardware and garden stores.
The costs for direct materials and direct labor for each type of doghouse are shown in the table below. The direct materials cost includes costs for lumber, shingles, stain or paint, and insulation. Nails and glue are also used in the construction and are considered indirect materials which make them part of overhead. The company employs two carpenters and a part-time student to maintain the equipment and clean the shop. The carpenters' wages are direct labor. The student's wages are indirect labor and, therefore, part of overhead. Other overhead costs include depreciation of equipment and the building, insurance, utilities, and taxes. Overhead is applied at 10% of direct labor cost. In the Doghouse summarizes costs by direct materials, direct labor, and overhead on its job cost sheets.
Direct Materials Direct Labor Standard: Small $64 $60 Medium 111 90 Large 135 150 Deluxe: Small $78 $120 Medium 152 180 Large 256 240 At the beginning of April, the company has one job, job number 304, in progress from the previous month. This job is for an order of 20 small, deluxe doghouses. As of April 1, $312.00 of direct materials have been used, $480.00 of direct labor have been charged to the job and $48.00 of overhead was applied to the job. Click on the link below to get more detail on job number 304.
During April, In the Doghouse received an order for 12 large, standard doghouses. This is job number 401 and was completed by the end of the month.
Another order was received during the month, job 402, for 16 medium, deluxe doghouses. At the end of April, job 402 was still in process. $1,459.2 of direct materials has been used, $1,728 of direct labor has been charged to the job, and overhead was applied to job 402 using the predetermined overhead rate of 10% of direct labor cost.
Complete the following job cost sheets for the month of April In the Doghouse and answer the following questions.
Job 304 20 small, deluxe doghouses Direct materials $ Direct labor Overhead Total job cost $ Job 401 12 large, standard doghouses Direct materials $ Direct labor Overhead Total job cost $ Job 402 16 medium, deluxe doghouses Direct materials $ Direct labor Overhead Total job cost $ What is the balance in Work in Process on April 1? $
What is the balance in Work in Process on April 30? $
Think outside the box:
What element would most likely be missing from a job cost sheet for a service organization?
+ Job number 304
Job number 304: The following job cost sheet was prepared at the end of the previous month and shows the direct materials, direct labor, and overhead costs as of the end of the month. When the job is completed in April, the amounts should show the totals for direct materials, direct labor, and overhead.
Job 304 20 small, deluxe doghouses Direct materials $312 Direct labor 480 Overhead 48 Total job cost $840
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started