As a Control Account Manager (CAM) on a large satellite development effort, creating a small cluster of formation flying satellite constellations that will measure greenhouse
As a Control Account Manager (CAM) on a large satellite development effort, creating a small cluster of formation flying satellite constellations that will measure greenhouse gases simultaneously around the globe. The total program is worth $965,000,000.
Specifically, you are the CAM for the power system which includes the solar array subsystems as well as the power distribution unit that provides power to the instrument payloads. This is no small task as this is a very large satellite with extensive wiring and interdependencies within the subsystem.
Yesterday, your Program Manager stepped into your office and wanted to discuss your Control Account status.She presented you with the following report data. She mentioned that you tripped the variance analysis report (VAR) threshold and needed to provide a credible, thorough analysis report.
Write a defensible VAR that the program manager can understand. You'll first need to fill in the report's missing information (shaded).
CA: Plumbing Subsystem | |||||||||
Number: OU812 | Report Period: Mar 2022 | ||||||||
Planned | Earned | Actual | Schedule | VAR | Cost | VAR | |||
in $000 | Value | Value | Cost | Variance | % | Variance | % | ||
Current Mo | 65 | 45 | 59 | ||||||
Cumulative | 1060 | 900 | 960 | ||||||
Budget At Complete | Estimate At Complete | Variance at Completion | |||||||
3400 | 3600 | ||||||||
- Problem Report:
- Impact:
- Corrective Action:
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started