Answered step by step
Verified Expert Solution
Question
1 Approved Answer
asap asap please 1) A residential project is designed to be built in 35.000m2 area. The project consists of 7 blocks, all of which have
asap asap please
1) A residential project is designed to be built in 35.000m2 area. The project consists of 7 blocks, all of which have 5 floors and 4 flats on each floor. Each block covers an area of 500m2, and 5000m2 is allocated for social facilities, parking and pool. Remaining areas will be used as green field. According to the program, construction period is 24 months. 2400 man-months workers and 240 man-months technical and administrative personnel are required to complete the project. All workers will be staying on site and technical and administrative personnel will not be staying on site. One month is 30 days. a) Calculate the production area. (5 pts) b) For the social units, calculate (15 pts) i. Dormitory area ii. Administration office area iii. Number of toilets and showers required in the dormitories iv. Day-time waiting area for the workers c) Considering that the work will be performed with a 10 day stock, what is the necessary storage capacity and the storage area for a site that will continue for 100 days, and 20.000 bags of cement (0.65x0.45x0.14) will be required in total? (Maximum 10 cement bags can be piled on, coefficient of safety is 1,5 and void ratio is 1,5) (10 pts) 2) Draw the construction site for the project given above. Show site roads, entrance-exit points, prevailing wind, site units, site utilities and other to be used throughout the project. Your drawing should be an ideal construction site plan acording to your comments. YOU CAN DRAW BY HAND NO NEED TO USE ANY SOFTWARE! (20) 3) 100 units of prefabricated blocks with dimensions of 2.00 m x 0.9 m x 0.2 m will be stored on a site. Calculate the storage area if stacking height is 1,8 m and void ratio is 1,3. (10pts) 4) 3.000m3 aggregate is required for a 150 day production on site with a 10 day stock. Calculate the necessary storage capacity if the coefficient of safety is 1,5. (10 pts) 5) List 3 work items in which excavators can be used. What are the 2 types of excavators? What are the differences between these 2 types? (15 pts) 6) What are the main causes of soil instability? What are the possible problems that may cause cave- ins? (15 pts) 1) A residential project is designed to be built in 35.000m2 area. The project consists of 7 blocks, all of which have 5 floors and 4 flats on each floor. Each block covers an area of 500m2, and 5000m2 is allocated for social facilities, parking and pool. Remaining areas will be used as green field. According to the program, construction period is 24 months. 2400 man-months workers and 240 man-months technical and administrative personnel are required to complete the project. All workers will be staying on site and technical and administrative personnel will not be staying on site. One month is 30 days. a) Calculate the production area. (5 pts) b) For the social units, calculate (15 pts) i. Dormitory area ii. Administration office area iii. Number of toilets and showers required in the dormitories iv. Day-time waiting area for the workers c) Considering that the work will be performed with a 10 day stock, what is the necessary storage capacity and the storage area for a site that will continue for 100 days, and 20.000 bags of cement (0.65x0.45x0.14) will be required in total? (Maximum 10 cement bags can be piled on, coefficient of safety is 1,5 and void ratio is 1,5) (10 pts) 2) Draw the construction site for the project given above. Show site roads, entrance-exit points, prevailing wind, site units, site utilities and other to be used throughout the project. Your drawing should be an ideal construction site plan acording to your comments. YOU CAN DRAW BY HAND NO NEED TO USE ANY SOFTWARE! (20) 3) 100 units of prefabricated blocks with dimensions of 2.00 m x 0.9 m x 0.2 m will be stored on a site. Calculate the storage area if stacking height is 1,8 m and void ratio is 1,3. (10pts) 4) 3.000m3 aggregate is required for a 150 day production on site with a 10 day stock. Calculate the necessary storage capacity if the coefficient of safety is 1,5. (10 pts) 5) List 3 work items in which excavators can be used. What are the 2 types of excavators? What are the differences between these 2 types? (15 pts) 6) What are the main causes of soil instability? What are the possible problems that may cause cave- ins? (15 pts)Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started