Question
Assignment 3 Construction of a Residential Complex Using the Activity-on-Node (AON) Method Company Y is a construction company that has been awarded a contract to
Assignment 3
Construction of a Residential Complex Using the Activity-on-Node (AON) Method
Company Y is a construction company that has been awarded a contract to build a residential complex. They aim to efficiently manage the project using the Activity-on-Node (AON) method in their Critical Path Method (CPM) analysis. The project involves multiple activities with interdependencies and strict timelines.
Project Details:
- Construction of a residential complex comprising three apartment buildings
- Key deliverables include site preparation, foundation construction, building erection, interior work, and landscaping
- Project duration: 12 months
Activity-on-Node (AON) Diagram:
yaml
A: Site Preparation
/ \
/ \
B: Foundation C: Building Erection
Construction
\ /
\ /
D: Interior Work
|
E: Landscaping
Activity Descriptions and Duration Estimates:
A: Site Preparation (4 weeks)
- Clear the site and prepare it for construction activities
- Tasks: Clearing vegetation, leveling the ground, establishing temporary facilities
B: Foundation Construction (10 weeks)
- Build the foundations for the apartment buildings
- Tasks: Excavation, pouring concrete, reinforcing structures
C: Building Erection (18 weeks)
- Construct the apartment buildings
- Tasks: Structural framing, roofing, exterior finishing
D: Interior Work (20 weeks)
- Complete the interior work of the apartments
- Tasks: Plumbing, electrical installations, flooring, painting
E: Landscaping (6 weeks)
- Complete the outdoor landscaping and beautification
- Tasks: Planting trees, laying pathways, installing outdoor amenities
Project Constraints:
- Building permits must be obtained before commencing construction activities.
- Availability of construction materials and equipment must be considered for timely execution.
- Construction work should adhere to local building codes and regulations.
AON Method Analysis:
- Determine the dependencies and sequence of activities based on the AON diagram.
- Calculate the earliest start time (ES), earliest finish time (EF), latest start time (LS), latest finish time (LF), and total float for each activity.
- Identify the critical path, which consists of activities with zero total float and determines the project's minimum duration.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started