Question

1 Approved Answer

Assume a computer system has 2 CPUs with a utilization rate of 8 0 % and 9 0 % respectively. The system has a scheduling

Assume a computer system has 2 CPUs with a utilization rate of 80% and 90% respectively. The
system has a scheduling algorithm that uses the Shortest Job First (SJF) policy. The average arrival
rate of processes in the system is 5 processes per minute, with an average burst time of 2 seconds
per process. Each CPU can execute a process in parallel.
a) What is the total throughput of the system in processes per minute?
b) What is the average response time of a process in the system?
c) If the system adds another CPU, what is the new total throughput of the system assuming
the same utilization rates?
d) If the utilization rate of the second CPU is increased to 95%, what is the new total
throughput of the system assuming the same number of CPUs?
e) Explain how the response time and throughput of a system are related and how operating
system designers balance the two when designing scheduling algorithms.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Understanding Oracle APEX 5 Application Development

Authors: Edward Sciore

2nd Edition

1484209893, 9781484209899

Students also viewed these Databases questions