Answered step by step
Verified Expert Solution
Question
1 Approved Answer
b. If a risk of incorrect acceptance of 15% is specified in the sample design, the sampling interval is $2,000, and five misstatements are found
b. If a risk of incorrect acceptance of 15% is specified in the sample design, the sampling interval is $2,000, and five misstatements are found as enumerated above, calculate:
1. Basic precision.
2. The incremental allowance for sampling risk.
3. The upper misstatement limit.
Assume the following misstatements were found in a PPS sample:
Sample Item, Book Value, Audit Value
1 $ 650 585
2 540 0
3 1,900 0
4 2,200 1,650
5 2,800 2,660
b. If a risk of incorrect acceptance of 15% is specified in the sample design, the sampling interval is $2,000, and five misstatements are found as enumerated above, calculate: 1. Basic precision. 2. The incremental allowance for sampling risk. 3. The upper misstatement limit. AP10.8 (LO 8) Challenging Evaluating a PPS sample Assume the following misstatements were found in a PPS sample: Sample Item Book Value Audit Value $ 585 $ 650 540 1,900 2,200 1,650 2,660 2,800Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started