Answered step by step
Verified Expert Solution
Question
1 Approved Answer
B. The soccer team shirts are manufactured at a factory in Hongkong. To produce shirts, the cloth must first be cut and folded, which
B. The soccer team shirts are manufactured at a factory in Hongkong. To produce shirts, the cloth must first be cut and folded, which requires 1 minute on average for each shirt. Three separate machines are available for this task. After the cloth is cut, the team logo is printed on the shirts. There are three printing machines, each of which can print on one shirt in 45 seconds. Finally, the printed shirt is then reviewed and packaged by a quality control worker. On average, this takes 90 seconds per shirt, but the standard deviation of this inspection step is 2 minutes. There are five quality control employees for this task. Orders for shirts arrive at exponentially distributed intervals, with an average of 160 orders per hour. | From beginning to end, the average time to produce one shirt is 4.5 minutes. 1. Find the capacity at each resource. 2. On average, there are 8/3=2.667shirts at the cutting step and 7.21 shirts at the inspection step. How many items are on average in the printing step? 3. To reduce average wait time, the factory wants to reduce the utilization of the inspection workers to 4/7 = 57.14%. How many total workers should there be at the inspection step in order to achieve this? 4. Under the new staffing derived in (3), what is the new average waiting time (in minutes) at the inspection step?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started