Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Basic Structure Inspection Question 1 of 15. Constructing a temporary rock causeway too high may result in damage during high water because of the damming
Basic Structure Inspection Question 1 of 15. Constructing a temporary rock causeway too high may result in damage during high water because of the damming effect on the stream and may cause problems with drilled shaft construction. True False O O Mark for follow up Question 2 of 15. Bridge demolition should occur in accordance with the Contractor's demolitions plan. submitted O approved O proposed O Mark for follow up Question 3 of 15. Temporary rock access causeways may be topped out with to allow equipment travel. Dirt Class B stone ABC All of the above None of the above O Mark for follow up Question 4 of 15. Sawing and removal of the deck and rails required by current guidelines. O Is Is Not Mark for follow up Question 5 of 15. Temporary work bridges do not require design approval by the DOT if they are within length limits do not carry public traffic are required by the plans None of the above Mark for follow upQuestion 6 of 15. Changing the way a stream is diverted to allow construction of a culvert may require a permit change is not allowed neither of the above Mark for follow up Question 7 of 15. During seasonally limited months, rock usually cannot be from streams. Placed Removed All of the above Mark for follow up Question 8 of 15. Equipment working on temporary rock causeways should be monitored for Rust Leaking oils and fuels Discoloration Mark for follow up Question 9 of 15. Permits contained in the contract are intended to provide a way to construct the project. True False O Mark for follow up Question 10 of 15. Tools and equipment such as pump lines and concrete buckets should not be washed out in live streams. True Fals O O Mark for follow up Question 11 of 15. Bridge removal or demolition is not regulated by the project permits. True Fals O OQuestion 12 of 15. Culvert flow lines are established in the plans to be approximately below the natural stream bed elevation. O Two feet O Zero feet O One foot None of the above Mark for follow up Question 13 of 15. Plans are developed with an access shown to the new bents to be constructed in the water. True False O Mark for follow up Question 14 of 15. The Contractor and the DOT are both required to follow the previsions of all permits contained in the contract. True False O OMark for follow up Question 15 of 15. Bridge demolition over water should be accomplished by shattering methods. True False O O Mark for follow up
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started