Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Blaze Corporation allocates overhead on the basis of DLH and the standard amount per allocation base is 4 DLH per unit. For March, the
Blaze Corporation allocates overhead on the basis of DLH and the standard amount per allocation base is 4 DLH per unit. For March, the company planned production of 8,000 units (80% of its production capacity of 10,000 units) and prepared the following budget. The company actually operated at 90% capacity (9,000 units) in March and incurred actual total overhead costs of $83,035. 80% Operating Levels Overhead Budget Production in units 8,000 Budgeted variable overhead Budgeted fixed overhead $ 33,000 $ 48,000 1. Compute the standard overhead rate. Hint: Standard allocation base at 80% capacity is 30,000 DLH, computed as 8,000 units x 3.75 DLH per unit. 2. Compute the total overhead variance. 3. Compute the overhead controllable variance. 4. Compute the overhead volume variance. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Compute the standard overhead rate. Hint: Standard allocation base at 80% capacity is 30,000 DLH, computed as 8,000 units x 4 DLH per unit. (Round your answer to 2 decimal places.) Standard overhead rate Required 1 Required 2 Required 3 Required 4 Compute the total overhead variance. (Indicate the effect of the variance by selecting favorable, unfavorable, or no variance. Do not round intermediate calculations.) Overhead variance Overhead variance Required 1 Required 2 Required 3 Required 4 Compute the overhead controllable variance. (Indicate the effect of the variance by selecting favorable, unfavorable, or no variance. Do not round intermediate calculations.) Controllable Variance Actual total overhead Budgeted flexible overhead Total Controllable variance Required 1 Required 2 Required 3 Required 4 Compute the overhead volume variance. (Indicate the effect of the variance by selecting favorable, unfavorable, or no variance. Do not round intermediate calculations.) Volume Variance Volume variance
Step by Step Solution
★★★★★
3.25 Rating (146 Votes )
There are 3 Steps involved in it
Step: 1
Solution 1 Standard overhead rate Budgeted variable ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started