Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Bruce's Material Company hauls gravel to a construction site, using a small truck and a large truck. The carrying capacity and operating cost per load

image text in transcribed
image text in transcribed
Bruce's Material Company hauls gravel to a construction site, using a small truck and a large truck. The carrying capacity and operating cost per load are given in the accompanying table. Bruce must deliver a minimum of 80 cubic yards per day to satisfy her contract with the builder. The union contract with her drivers requires that the total number of loads per day is a minimum of 5. How many loads should be made in each truck per day to minimize the total cost? Small Truck Large Truck Capacity (yd') 20 40 Cost per Load $69 $56 In order to minimize the total cost, the number of loads in a small truck that should be made is and the number of loads in a large truck that should be made is

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Contemporary Precalculus A Graphing Approach

Authors: Thomas W Hungerford, Carol C Kanar, Douglas J Shaw

5th Edition

1111798508, 9781111798505

More Books

Students also viewed these Mathematics questions

Question

=+a) What is the center line for the R chart?

Answered: 1 week ago