BUS! 4573.0] NamcfSurnai-rm: lD: LAB-QUIZ signature: The project begins May 16, 2022. The holidays are given below: 0 Holiday A -> 19' of May 0
BUS! 4573.0] NamcfSurnai-rm: lD: LAB-QUIZ signature: The project begins May 16, 2022. The holidays are given below: 0 Holiday A -> 19'" of May 0 Holiday B -> 30"\" of August 0 Holiday C -: 8"\"-12"' ofJuwr Please answer the following questions: 1) When is the project estimated to be completed? (10 Points) 2) How long will the project take? {10 Points] 3) What is the critical path for the project? {20 Points) 4} Write two sensible milestones and explain your choices. {20 Points) 5} Which if any ofthe resources are overallocated? (20 Points) 6) How much will the project cost? (20 Points) Name/Surname: BUSI 4573.01 ID: LAB-QUIZ Signature: Enter the tasks, durations, predecessors and resources for the following Environment Management Project into the MS PROJECT. Don't forget to create the Work Breakdown Structure D Task Name Duration Predecessor Resource Environment Management 1 Project 2 1.1. System Design 1.1.1. Initial Design 90 6 24 Development(2), Design(1) 4 1.1.2. Client Meeting Design(2), Development(3) 5 1.1.3. Draft Design 60 Documentation, Design(1) 6 1.1.4. Client and Agency 7 25 Assembly, Development(2) Meeting 1.1.5. Design and Meeting 7 10 26 Documentation Documentation 8 1.1.6. Final Design 30 7FS+60 days Design(2), Development(2) 9 1.2. System Installation 10 1.2.1. Well Installation 60 24 Engineer(2) 11 1.2.2. Soil permeability test 10 Assembly, Development(2). 12 1.2.2.1. System Operation Test 40 Engineer(3) 13 1.2.2.2. Test Report 33 25 Development(2), Documentation 14 1.2.3. In Stu Respiration Test 90 10 Development(3), Assembly 15 1.2.4. Long-Term Bio-Venting 100 10 Engineer(2), Documentation Test 1.2.5. Operation, Maintenance 50 Development(3), Assembly, 16 26 and Monitor Engineer(3) 17 1.3. Utilities 18 1.3.1. Specifications 15 24 Development, design 19 1.3.2. Routine utilities 60 18 Development(2) 20 1.3.3. Complex utilities 80 18 Development, Assembly 21 1.3.4. Utilities documentation 20 18 Documentation, Design(2) 22 1.3.5. Shell 60 26 Development(2) 23 1.4. Conformation Sampling 24 1.4.1. Soil Boring and Sampling 65 Design(2) 25 1.4.2. Data Validation 50 5,12,14,15,19,20,21 Assembly, Development 26 1.4.3. Client Meeting 7 6,13 Engineer(4) 27 1.4.4. Draft Report 15 26 Development, Engineer(2) 28 1.4.5. Final Report 34 8,16,22,27 Assembly, Development Resource Design 4 $700 /wk Development 3 $ 86 /hr Documentation 2 $ 91 /hr Assembly 1 $ 85 /hr Engineering 2 $ 160 /hr
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started