Question
Carter, Inc. produces two different products, Product A and Product B. Carter uses a traditional volume-based costing system in which direct labor hours are the
Carter, Inc. produces two different products, Product A and Product B. Carter uses a traditional volume-based costing system in which direct labor hours are the allocation base. Carter is considering switching to an ABC system by splitting its manufacturing overhead cost of $1,168,000 across three activities: Design, Production, and Inspection. Under the traditional volume-based costing system, the predetermined overhead rate is $2.92/direct labor hour. Under the ABC system, the rate for each activity and usage of the activity drivers are as follows:
Activity Rate | Usage by Product A | Usage by Product B | |||||||
Design (Engineering Hours) | $ | 800 | /hour | 150 | 250 | ||||
Production (Direct Labor Hours) | $ | 1.50 | 100,000 | 300,000 | |||||
Inspection (Batches) | $ | 620 | 300 | 100 | |||||
Required:
a. Calculate the indirect manufacturing costs assigned to Product A under the traditional costing system.
b. Calculate the indirect manufacturing costs assigned to Product B under the traditional costing system.
c. Calculate the indirect manufacturing costs assigned to Product A under the ABC system.
d. Calculate the indirect manufacturing costs assigned to Product B under the ABC system.
e. Which product is under-costed and which is over-costed under the volume-based cost system compared to ABC?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started