Case Study Part I Submit snapshots of your control charts along with the case questions. In addition, submit the spreadsheet file used to create your

Case Study Part I

Submit snapshots of your control charts along with the case questions. In addition, submit the spreadsheet file used to create your charts.

Read the following Case Study in your textbook:

Case Study 9.2: Max's B-B-Que Inc.

The following data is provided in Case Study 9.2 in the text:

  • The average number of strokes for a tool is 45,000.
  • The standard deviation is 2,500 strokes.
  • A punch has a total of 25 mm that can be ground off before it is no longer useful.
  • Each regrind to sharpen a punch removes 1 mm of punch life.
  • The cost to regrind is:
    • 2 hours of press downtime to remove and reinsert tool, at $300 per hour
    • 5 hours of tool maintenance time, at $65 per hour
    • 5 hours of downtime while press is not being used, at $300 per hour
    • The average wait time for unplanned tool regrind is 15 hours at $300 per hour.

Because of the large number of strokes per tool regrind, this is considered to be a continuous distribution. The normal curve probability distribution is applicable.

Case Study Part II

Using the data provided in Case Study Part I above, perform calculations to answer the following questions:

  • What is the probability that a tool will last?
    • 52,000 strokes
    • 41,000 strokes
    • 45,000 strokes

Given the production life data provided in Case Study 9.2 in the text, answer the following questions:

  • What is the mean and standard deviation of the "production over life of tool"?
  • What is the probability that the "production over life of tool" will be:
    • 1,200,000
    • 875,000
    • 1,042,000

Given your analysis of the questions in Part I of the case study, what is the probability that:

  • The tool will be pulled for regrind 20 times
  • The tool will be pulled for regrind 23 times
  • The tool will be pulled for regrind 18 times
  • The tool will be pulled for regrind 25 times

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Revisiting Supply Chain Risk

Authors: George A Zsidisin, Michael Henke

1st Edition

3030038122, 978-3030038120

More Books

Students also viewed these General Management questions