co Glassworks Inc produces two types of glass shelving rounded edge and squared edge, on the same production line For the current period, the company reports the following data, Direct materials Direct labor Overhead (300x of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge 59,700 6,00 18,000 $ 33,700 10,700 ft. $ 3.15 Squared Edge Total $ 21,600 $ 31,300 11,800 17,800 35,480 $3,400 $ 68,800 $102,500 14,000 ft. $ 4.91 Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $53,400 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Total overhead Cost $ 2,136 28,520 22,744 553,400 Chec She has also collected the following information about the cost drivers for each category (cost pool and the amount of each driver used by the two product lines (Round activity rate and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Direct labor cost (5) Machine hours Setups (number) Rounded Ede $6,000 400 hours 30 times Squared Edge $11,800 800 hours 95 tines Total $17,800 1,200 hours 125 times Activity Rate Required: 1. Assign these three overhead colpools to each of the two products using ABC Activity Overhead Cost Activity Drivers Supervision Direct labor cont Depreciation of machinery Machine hours Assembly line preparation Setups Rounded edge Activity rate Supervision % 0 Depreciation of machinery Assembly line preparation 0 Activity driver incurred Overhead assigned 10 Activity rate Activity driver incurred Overhead assigned Squared edge Components Supervision Depreciation of machinery Assembly line preparation % 0 0 0 Determine average cost pul tool for each of the two products using ADC Rounded edge Squared edge