Question
Complete a task analysis of TAKING OUT A SPARE PUMP FPR MAINTENANCE The task is to take out a spare pump for maintenance. Assume that
Complete a task analysis of TAKING OUT A SPARE PUMP FPR MAINTENANCE
The task is to take out a spare pump for maintenance. Assume that the spare pump is in parallel with the other pump and has a double block on each side of the spare pump and a bleed to isolate the pump. There is also a flowmeter, a thermocouple and a pressure transmitter in the line from both pumps.
1- Write a procedure for the operation.
2- Perform a Hierarchical Task Analysis (HTA) This should be accompanied by a schematic drawing of the plant which shows and labels all the items of equipment referred to in your analysis. The HTA should be performed on the operation the schematic drawing should be based on symbols, not actual pictures/images, and the drawing. The HTA should start at the point that the spare pump has been stopped after being in operation.
3- Based on the HTA, identify 5 safety critical steps and perform a Human Failure Analysis of one step marking the impact of at least 5 performance influencing factors.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started