Question

1 Approved Answer

Consider a batch manufacturing process in which a machine processes jobs in batches of three units. The process starts only when there are three or

Consider a batch manufacturing process in which a machine processes jobs in batches of three units. The process starts only when there are three or more jobs in the buffer in front of the machine. Otherwise, the machine stays idle until the batch is completed. Assume that job interarrival times are uniformly distributed between 2 and 8 hours, and batch service times are uniformly distributed between 5 and 15 hours.

Assuming the system is initially empty, simulate the system manually for three batch service completions and calculate the following statistics:

• Average number of jobs in the buffer (excluding the batch being served)

• Probability distribution of number of jobs in the buffer (excluding the batch being served)

• Machine utilization

• Average job waiting time (time in buffer)

• Average job system time (total time in the system, including processing time)

• System throughput (number of departing jobs per unit time)

Approach: After each arrival, schedule the next interarrival time, and when each batch goes into service, schedule its service completion time. To obtain these quantities, use your calculator to generate a sequence of random numbers (these are equally likely between 0 and 1, and statistically independent of each other). Then transform these numbers as follows:

a. To generate the next random interarrival time, A, generate the next random number U from your calculator, and set A = 2 + 6 U .

b. To generate the next random batch service time, B , generate the next random number U from your calculator, and set B = 5 + 10 U . If you cannot use random numbers from your calculator, use instead deterministic interarrival times, A = 5 (the average of 2 and 8), and deterministic service times B = 10 (the average of 5 and 15).

Step by Step Solution

3.33 Rating (150 Votes )

There are 3 Steps involved in it

Step: 1

To simulate the system manually we need to keep track of the current time the number of jobs in the buffer the time of the next arrival the time of the next batch service completion and the total numb... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Entrepreneurial Small Business

Authors: Jerome Katz, Richard Green

5th edition

1259573796, 978-1259573798

More Books

Students also viewed these Mathematics questions