Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Coursework 5 1 Herbert Newman Regional Airport has two diverging runways (non-intersecting). Given the following operations and using the methodology for long-range planning, estimate hourly
Coursework 5 1 Herbert Newman Regional Airport has two diverging runways (non-intersecting). Given the following operations and using the methodology for long-range planning, estimate hourly capacity, ASV, and minutes of annual delay in Year 10. You will need to reference the Aviation Planning textbook Chapter 5 and/or FAA AC 150-5060-5 for the methodology and FAA figures %A Number of Total Annual Operations Number of Class A Operations Number of Class B Operations Number of Class C Operations Number of Class D Operations Answer Questions 1 and 2 below. 1. Complete the worksheet below. Aircraft %B 2 Mix 596 3 %D Herbert Newman Regional Airport Year 10 4 Mix Configuration Index 96(C+3D) 5 No Sketch VFR IFR 6 Capacity (Ops/Hour) 7 8 9 ASV (000) 10 Annual Annual Demand Demand (000) ASV 11 12 135,000 50,000 50,000 35,000 0 Average Delay per Aircraft (Minutes) Low High Low High 13 14 Minutes of Annual Delay (000) 2. What is the ASV in Year 20 if the airport adds a third parallel runway at a parallel runway centerline-to-centerline separation of 1.200 feet? Assume the mix index in Year 20 is the same as the mix index in Year 10 15 16
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started