Create a work breakdown for a water main project with 1 0 0 0 f t of pipe, 3 valves, a fire hydrant assembly, in
Create a work breakdown for a water main project with of pipe, valves, a fire hydrant assembly, in a roadway so repave See if you can find such a project and gather some informationphotos
Outline the section of work in a standard set of specifications provide an example of each section and the work covered.