Determine the utilization and the efficiency for each of these situations: a. A loan processing operation that processes an average of 6 loans per day.
Determine the utilization and the efficiency for each of these situations:
a.A loan processing operation that processes an average of 6 loans per day. The operation has a design capacity of 16 loans per day and an effective capacity of 13 loans per day.(Round your answer to 1 decimal place. Omit the "%" sign in your response.)
Utilization%Efficiency%
b.A furnace repair team that services an average of 3 furnaces a day if the design capacity is 9 furnaces a day and the effective capacity is 5 furnaces a day.(Round your answer to 1 decimal place. Omit the "%" sign in your response.)
Utilization%Efficiency%
c.Would you say that systems that have higher efficiency ratios than other systems will always have higher utilization ratios than those other systems?
This is not necessarily
(Click to select)
false
true
. If the design capacity is relatively
(Click to select)
high
low
, the utilization could be
(Click to select)
high
low
even though the efficiency was
(Click to select)
low
high
.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started