: During one eight - hour shift, 6 0 0 non - defective parts are desired from a fabrication operation. The standard time for the
: During one eighthour shift, nondefective parts are desired from a fabrication operation. The
standard time for the operation is minutes. Because the machine operators are unskilled, the actual
time it takes to perform the operation is minutes, and, on average, onefourth of the parts that begin
fabrication are scrapped. Assuming that each of the machines used for this operation will not be
available for one hour of each shift, determine the number of machines required. pts
Q: In Example solved in class, the machine fraction became and machine per operator was
the optimum assignment. Co $ per hour. Suppose the cost per machine hour Cm is unknown. For
what range of values of Cm will the optimum assignment remain the same machines per operator
Justify your answer. pts
Q: It takes minutes to load and minutes to unload a machine. Inspection, packing, and travel
between machines totals one minute. Machines run automatically for minutes. Operators cost $
per hour; machines cost $ per hour. pts
a What is the maximum number of machines that can be assigned to an operator without
creating machine idle time during a repeating cycle?
b What assignment minimizes the cost per unit produced?
c If four machines are assigned to an operator, what will be the cost per unit produced?
d For what range of values for concurrent activity is the optimum assignment equal to four?
Q: An industrial engineer is asked to propose a facilities layout for a manufacturing firm. He is
supposed to use prioritization matrix to prioritize his alternatives and propose the best alternative.
Based on the managers decision he has to focus on criteria. After a detailed analysis the
following prioritizing matrix of criteria has been generated. pts
Where A B C and D are the criteria to design a layout and the numbers are weights used to
compare criteria. The weights definition is the same as lecture He also has generated
layouts P Q and R alternatives and the prioritizing matrix of layouts for each criterion is as
follow:
Rank the alternatives based on the criteria.
Q: Use Direct Clustering Algorithm to arrange the machines and parts in the machinepart matrix
below to the manufacturing cells. If there are bottleneck machines, decide what you can dopts
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started