: During one eight - hour shift, 6 0 0 non - defective parts are desired from a fabrication operation. The standard time for the

: During one eight-hour shift, 600 non-defective parts are desired from a fabrication operation. The
standard time for the operation is 15 minutes. Because the machine operators are unskilled, the actual
time it takes to perform the operation is 20 minutes, and, on average, one-fourth of the parts that begin
fabrication are scrapped. Assuming that each of the machines used for this operation will not be
available for one hour of each shift, determine the number of machines required. 6pts
Q2: In Example 2.7 solved in class, the machine fraction became 2.67 and 2 machine per operator was
the optimum assignment. Co =$15 per hour. Suppose the cost per machine hour (Cm) is unknown. For
what range of values of Cm will the optimum assignment remain the same (2 machines per operator)?
Justify your answer. 6pts
Q3: It takes 3 minutes to load and 2 minutes to unload a machine. Inspection, packing, and travel
between machines totals one minute. Machines run automatically for 20 minutes. Operators cost $12
per hour; machines cost $30 per hour. 6pts
a. What is the maximum number of machines that can be assigned to an operator without
creating machine idle time during a repeating cycle?
b. What assignment minimizes the cost per unit produced?
c. If four machines are assigned to an operator, what will be the cost per unit produced?
d. For what range of values for concurrent activity is the optimum assignment equal to four?
Q4: An industrial engineer is asked to propose a facilities layout for a manufacturing firm. He is
supposed to use prioritization matrix to prioritize his alternatives and propose the best alternative.
Based on the managers decision he has to focus on 4 criteria. After a detailed analysis the
following prioritizing matrix of criteria has been generated. 6pts
Where A, B, C and D are the criteria to design a layout and the numbers are weights used to
compare criteria. (The weights definition is the same as lecture 8). He also has generated 3
layouts P, Q and R alternatives and the prioritizing matrix of layouts for each criterion is as
follow:
Rank the alternatives based on the criteria.
Q5: Use Direct Clustering Algorithm to arrange the machines and parts in the machine-part matrix
below to the manufacturing cells. If there are bottleneck machines, decide what you can do.6pts

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Successful Project Management

Authors: Jack Gido, Jim Clements

4th Edition

9780324656152, 324656130, 978-0324656138

More Books

Students also viewed these General Management questions

Question

What is the basic features of Plato soul......?

Answered: 1 week ago

Question

Term also regard to God......?

Answered: 1 week ago

Question

Poetic deals primarily with what genre......?

Answered: 1 week ago

Question

The work we call physics is more properly described what...?

Answered: 1 week ago

Question

Whose niece did Aristotle marry?

Answered: 1 week ago