Question
Estimate each activity's duration and cost a. Using the web and other sources, find costs for various items. For example, you can calculate the concrete
Estimate each activity's duration and cost
a. Using the web and other sources, find costs for various items. For example, you can calculate the concrete paver path area in square feet, multiply that by the cost for each 12 in. x 12 in. paver. Document your cost/time source(s)!
b. Use all four of the estimating techniques. Three-point estimating can be quite useful for duration estimates.
c. For self-performed construction, you can drive four (4) stainless steel screws into boards per minute.
d. Sum the costs for your activities and include 15 percent more for contingencies.
PROVIDE REFERENCES for sources used in your explanation.
Planning your project:
Building department |
Confirm building/zoning area |
Establish designs for renovation |
Bring designs to building department |
Receive building permits |
Get referrals, do research, check references - Obtain estimates |
Establish/Hire contractors |
Establish Bill of material |
Confirm if there are restrictions |
Building A Deck:
Lay out plastic to prevent weeds |
Lay out gravel on top of plastic |
Treat any exposed wood |
Build Deck |
Paint Deck |
Building a Pond:
Install shallow plastic lined pond |
Install rock ledge style waterfall |
Install irrigation connection |
Inspection of the complete project
Complete final walk through of project |
Ensure all area are within spec |
Ensure all areas meet permit requirements |
Look for any defaults or incomplete work |
Address issues with contractors |
Confirm all issues are fixed |
Final touches and clean up |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started