Estimate the cost of a median quality, 5,000 ft medical office to be built in Panama City, FL starting in January 2008. Assume that this estimate is made in January 2007 and cost increase is |5.0%/year. Include a design fee. (20 points) K1010 S.F, C.F. and % of Total Costs UNIT COSTS %OF TOTAL K1010 S.F.&C.F. Costs INT MEDIAN 3/4 14 MEDAN 34 510 3100 2880 510 SE RAK1010 410 825 115 1480 990% 25 90% 520 0010 JAILS 520 SF 14 180 232 RK101 CE SE 010 1315 5.85 1615 6.10 2055 0020 Total project costs Equipment Pumbing Heating,vendting ar conditining 940 1800 27.35 49 1520% 1420 18.05 2380 2720 8.90% 13.80% 9.40% 17.109 12.50 1680 3245 750 2770 15 35 9.70 2440 810% 1140 2900 Eecrical 1240% 822 Total Mechanical&Electrica 69 50 292 34.10 3915 31 10 3100 530 0010 LBRARES SE RK112 8320 106 135 Tetai oriect oests Msony 585 7.30 945 0020 CE 18 3 58% $50% 0600 476 060 l1.90% Equipment Plunbing Heatrng veniling, i coing Electrical Tota Mechanical&Electrical 120 324 505 120% 1800 28% 450 2720 326 475 640 34% 5 70 460% 4.90 2770 720 1220 1590 J0 70% 8.55 060 1375 8.30% 2900 12 2455 4220 1890 3100 33.70 96 90 25.30 2760 540 O010 LMING ASSISTED Total project cests SF RK101 8480 l14 10 0020 CE 705 8.05 950 380 0500 283 SE 240 313 32% Masonry Eqipment Punbing 240% 210N% 1800 2.06 24 240% 250 2720 6.85 915 970 060 8.80% 2770 Heating verting ir condiing Electrical 8.10 850 9.35 790 9.70 8.05 2900 915 1020 9308 1040% 10,70 Tta: Mechanical&Electrica 23.10 27.10 3015 2790 3100 3010% 32 550 0010 MEDICAL CLINICS SF 8185 101 127 RK10 Total project costs Equipment Pubing Heatng ventlaing ar condtoning 610 190 1055 0020 224 735 180% SF 471 5.20% 130 1800 840% 2720 550 7.75 1040 610 JO% 6 55 8.50 130% 1265 6 70 2770 96 6.95 495 1315 810% 200 Bectrical 12 20 Total echanical&Electrica 27.60% 34 30 21.85 30,75 43 228 See aiso dision 11700 570 0010 MEDICAL OFFICES 3500 570 76 85 95 25 SF RK11 CF 50 185 1075 O020 Total project costs Equpment Pumting Heating vetlating ar condtoning 7.30 SE 271 510 360% 5.90% 1.20 1800 680% 8 60 431 6.65 9 570% 2720 7.65 620 520 9.95 9.70 2770 2900 3100 6 10 15 15 8.90 2175 980% 1240 760% I140S ectrical 32 35 Totak Nechanical&Electrical 850 24.90 225 11S Square Foot Base Size Building Type Building Type Apartments, Low Rise Apartments, Mid Rise Apartments, High Rise Auditoriums Auto Sales Banks Median Cost per S.F $ 58.80 74.30 85.25 98.40 60.85 132.00 88.85 88.60 Typical Range Gross S.F 9,700 32,000 100,000 Libraries 95,000 7,600 10,800 2,500 2,000 4,500 6,000 13,500 Offices, High Rise 12,80039,400 Police Stations 15.000 16,600 16,000 85,000 Religious Education 5.300 17.800-106,000 Restaurants Median Cost per S.F $180.00 106.00 101.00 95.25 72.95 95.05 Typical Range Gross S.F. 5.500-145,000 7,000 Typical Size Gross $.F. 21,000 50,000 145,000 25,000 20,000 4,200 17,000 6,500 10,000 28,300 50,000 45,600 33,400 9,400 32,400 Typical Size Gross S.F 40,000 12,000 7,200 6,000 37,200 Jails 31,000 600,000 Medical Clinics 39,000 Medical Offices 28,600 Motels 7,500 Nursing Homes 42,000 Offices, Low Rise 15,000 Offices, Mid Rise 4,200 15,700 4,000 15,000 15,800 120,000 15.000 . 40,000 23,000 20.000 37,000 80,000 Churches Clubs, Country Clubs, Social Clubs, YMCA Colleges (Class) Colleges (Science Labl College (Student Union) Community Center Court Houses 79.45 83.45 5,000 20 000 300,000 120.000 800,000 4,000 . 120,000 260,000 10,500 12,400 7,500 9,000 19,000 4,400 86.20 86.40 116.00 169.00 129.00 92.60 126.00 107.00 133.00 19,000 30,000 150,000 Post Offices 80,000 Power Plants 6,800 1,000 98.40 733.00 81.50 139.00 119.00 20,000 6.000. 12,000 16,700 Research 6.300 45,000 2,800 6,000 Design& Engineering General Conditions RH1010-200 Table H1010-201 Architectural Foes proportionately. For alterations, add 50 % to the fee for the first $500,000 of project cost and add 25 % to the fee for project cost over $500,000. Tabulated below are typical percentage fees by project size, for good professional architectural service. Fees may vary from those listed depending upon degree of design difficulty and cconomic conditions in any particular area Architectural fees tabulated below include Structural, Mechanical and Electrical Engineering Fees. They do not include the fees for special consultants such as kitchen planning, security, acoustical, interior design, Rates can be interpolated horizontally and vertically. Various portions of the same project requiring different rates should be adjusted etc. Total Project Size in Thousands of Dollars 500 Building Types Factories, garages, warehouses, repetitve housing Apartments, banks, schools, lbraries, offices, municipal buildings Churches, hospitals, homes, laboratories, museums, research Memorials, monumental work, decorative furnishings 5,000 100 250 1,000 10,000 4.9% 50,000 4.5% 9.0% 6.2% 5.3% 8.0% 7.0% 9.2 12.2 12.3 8.0 7.0 6.6 6.2 15.0 13.6 16.0 12.7 11.9 9.5 8.8 8.0 14.5 13.1 10.0 9.0 8.3 City Cost Indexes RJ1030-010 Building Systems NE HCKALL NO SURUCTU SL Sp Er ou LDING SYSTEMS OHENECTD TOAL TOIA J045 100 959 54 1262 478 S29 152 4 2 96 1476 32 176 147A NTERORS C en 956 DRO-40Mec 3 O12 003 958 963 967 080 Dectrc EQUPMENT&FURNSHIGS 000 E 1802 47 BULDNG SITEMORK MEGHD AVEAGE 708 07 2 975 BNG SYSTEM PENSACOL OTAL UUSE NAC TOAL MA 9EL Set S16 708 009 4 14 546 s32 22 317 62 2 %4 2 S45 736 Reig 967 830 %3 105 TON 999 S 53 C NTORS 24 B16 C20-4 050 chical Ec E 274 63 62 89 545 87 754 999 976 1000 167 53 S4 44 S45 EQUPMENT&RURNSHeG BUNG STEWORK WEIGHTED AVERAGE 1000 1294 100 272 54 000 67 64 7.3 41 HLADEH BDNG SYSTEMS TORK OAL TAL MA TOL SUBCR S Spenct E 830 1245 1259 180 1286 3049 871 4 156 29 0 2 83 82 83 954 1085 SE8 1OR3 12 00 cng INERORS MCEE Coveng 105 974 00 44 057 52 %3 2 982 82 020-40chic JO03 226 307 03 979 1300 %1 573 985 %7 1000 82 957 951 050 63 00 83 300 1 1275 47 32 Ectic EQUPMENT&RURNSHINGS BULDING STONORK WEGHTED AVERAGE 972 00 000 42 057 %0 2 1OLE 2 Size Factor 60 70 90 10 3.0 +12 12 115 Cost Modifier Curve L15 L1 1.05 106 1.0 10 95 96 Area Conversion Scale 90 90 85 85 80 50 7080 90 10 20 30 Cost Multiplier 20 RL1020-200 Partition/Door Guidelines Reference Aids Table L1020-201 Partition/Door Density dgType Sorles Pario/Dty 990 Deo Desorption of Paron Pste,wod doors& Aartents ry 2y 90/ 80S 90 8EAF Dr wod s wod doors& r Pte, wood st, wod doors&tin Pa, netal st wood doors &tim D eta h wood dors&t Canc bleck pant, door&drywal wood std Con bock pat, door &drya wood stads Paste, woad sh d 9A 99AF 3ry 80 SE 500 500 SE 200 S 150 SF 500 S 50E/ 150 SEo 615 dary 1 stry 8 SFAF 50 SPA 50 SELF 20 SA 5 SEAF 50 SEAF 50FZ1 15SEAF ary 2tn Brk 24 ny story Past, nea wood doos&t Conc biock, dywal neta th, wood i Conc beck, wood &metal doors wood t Conc biock, cea te wood t Dwall on neta Concete blck, pated &o Concete bleck gad e imted coer don Drwal a sh, wood doors& 30% cancte ock, % dywood studs Paster, concree ock, wod doors&t Paster corte blodk, wood doors &tm Pacter, conce oc wod doos &tim Paster on concete ech&wood span Paster wood pareing& wood doors 5O% con beck 50% oyw wod th Paster, coc ood s& oting Plart bong Any Bs l story y Canery Car Nash Lary Part Departmet Store story stry 10 SA 60 SEAF 60 SA story 1 shry 600 600 E 25 e 2 sry 35 615 Comtry 90 9SEAF 15EAF 14EAF Fneral one 1 story 2 story 1 story 140 SFo 300 SEo 90 S 90 S Carage Sales&Sere 30 SEA 9AF obel 95 9FAF Paster, co eck wood doors&t w wood th od doo& yw wod shs, wood doors&m w nt wood doors&i by wood shs, wood dos & Canote teck dywl on netl , wood pareig Cancee bock, wood me b Can ockwood ney Carce bock wood n Drywl wod oors& Dyw wod doos& cote bock, 7ON ayw owod stats 30% conte bck 7N dy n 3%cone bck 70% nole ations % coe bck, 70 noable pation 3%conste eck 70N noate prions Sr and ele nc y Sr and er cosres only 25 SA Landomat Vedcal Cs stoey 694 6AF 79 7SFAF 18 SAF 1 sry 24 n 1 story 23 on I sry Mee Thee 200600 sa 200 250 9 601400 seat 20 SFAF 25 EAF 8SEAF 8A 209 20EA 20U 140122000 sa rng Home 1 ry 24 tory 1 stry 80 20050/m 300500 E 200500 E 200500 E 200500 / 600 SF 600 ce 2 story 35 610 ty 1120 28 ny 28 on I ny 20SU 20A 60SEAF 60 Pang Rane pe Pakng grage Prengnered See Drywa an mel swd s&t 600 60 SEA 15 SEA 1 50 / 130 / Can bk novble wood partton Sop rhone I ry 15 Mouble wod parons Cante bock, netl ad wood doors Can block e ad wood doors Cooete bock, wood and t Dryw meta s, cwanc&pa Canete bock pareing wood shs&tin Rade&TV ktr I ry 25 SEAR 40 SEU 15 SAU 18 25 25A 250 S 400 E ece estar Ce&Driee tart n 250 250 240 SE 600 150 S 150 S 150 Restarat wth g Spper Cub Br or Lounge etaeo Service St 1n Canoee bockpaing wood & Pad gn woded Drywal nea th ood doors&t Canete back, pat, do&dy wood teh Canoete bock, pairt do&dyw wood Dralwod sweod dors& Drywal metal stas,wood doons& 5N ctebock sON y wood stas 50% conte bck, 5ONy wood sd Conoete bck dwalwod shawd Paser, metal sah wood dours &tin Pade net u wood dors&i Pa, ta wood doars &tin Concete ck pt, dyw&pon pae 24 SEAF 60SEAF Masowy 15 SA anl I5 SEAF Fmer 15 SA Shopping Center 300 400 400 SE 300 S 1stry I stry 2 ry 40 SFLF 30 SEL 0 SE O SFLF 10 SE Seul Fand Stm Store Apt above 2 try 2ry 3try Masoy Fme 100 SE 100 SE Fre Spmaets Thck em try FIGURE 6.11. This table is useful for quickly and accurately determining partition and door quantities during design From R. S. Means Assemblies Cost Deta 2009. O R. S. Means Co., Inc, Kingston, MA, 781-422-5000, all rights reserved. K1010 S.F, C.F. and % of Total Costs UNIT COSTS OF TOTAL K1010 S.F.&C.F. Costs UNT MEDIAN 14 14 MEDAN 34 28 80% 510 510 300 SE RK101 825 115 1480 990% 2590% 10 520 0010 JAILS 520 14 180 232 RK101 010 Total project costs Equipment Pumbing Heating,venkting, r condioning CE 5.85 SE 1315 16.15 205 0020 96.10 940 1800 27.35 43 15 20 1420 8.05 2380 2720 7% 8.90% 13.80% 9.40% 17.109 12.50 16.80 3245 750% 2770 15 35 9.70 2440 810% 1140% 200 Eecrical I240% 822 3100 Total Mechanical&Electrica G9 50 29 2 34.10 3915 31 10 530 O010 LBRARES 8320 135 SE RK1012 106 410 Tetai oroiect oosts Mesonry 585 945 0020 CF 7.30 58 0600 18 3 $50 SF 476 060 l1.90% Equipment Plunbing Heating veialdig, i codiong Electrical Tota Mechanical&Electrical 120 324 505 12% 1800 28% 450% 2720 326 475 640 34% 5 70 4.90 2770 720 1220 1590 460% 30.60 J0 70% 2900 855 1375 830% 128 2455 4220 1890 3100 33.70 96.90 25.30 2760 540 O10 LMING ASSISTED Total project cests SF FK101 CE 848 l14 10 0020 705 805 950 380 0500 283 32% SF 240 313 Masonry Eipment Pumbing Heating verlting, ir condiing Electrical 240% 210N 1800 2.06 24 240% 250 6.85 2720 915 970 060 2770 8.10 850 935 790 8.80% 9.70 8.05 23.10 2900 915 1020 9308 1040 10,70 Tta: Mechanical&Electrica 2.0 3015 2790% 3100 3010% 32% 550 0010 MEDICAL CLINICS S.F 8185 101 127 RK10 Total project costs Equipment Punbing Heating ventleing air condtioing Electrical Tota Nechanical&Electrical 610 224 190 1055 0020 7.35 180% 1800 SF 471 5.20% 130 840% 2720 550 7.75 1040 6J0% JO% 6 55 8.50 1265 130% 12 20 34 30 6 70 2770 96 6.95 495 1315 810% 200 0% 2760% 300 21.85 30,75 43 225 See aiso dision 11700 570 0010 MEDICAL OFFICES 3500 570 76 85 95 25 SF RK101 CF 570 185 1075 O020 Total project costs Equipment Pumting Heating vetlating ar condtioning Becical 7.30 SE 271 510 360% 590% 120% 1800 9 680% 431 6.65 5,70% 8.60 2720 620 520 ,65 9.95 9.70 2770 8.90 2175 610 1240 160 980% 1140 2900 3100 15 15 32 35 Total Nechanical&Electrical 18 50% 228 24.90% 111S Estimate the cost of a median quality, 5,000 ft medical office to be built in Panama City, FL starting in January 2008. Assume that this estimate is made in January 2007 and cost increase is |5.0%/year. Include a design fee. (20 points) K1010 S.F, C.F. and % of Total Costs UNIT COSTS %OF TOTAL K1010 S.F.&C.F. Costs INT MEDIAN 3/4 14 MEDAN 34 510 3100 2880 510 SE RAK1010 410 825 115 1480 990% 25 90% 520 0010 JAILS 520 SF 14 180 232 RK101 CE SE 010 1315 5.85 1615 6.10 2055 0020 Total project costs Equipment Pumbing Heating,vendting ar conditining 940 1800 27.35 49 1520% 1420 18.05 2380 2720 8.90% 13.80% 9.40% 17.109 12.50 1680 3245 750 2770 15 35 9.70 2440 810% 1140 2900 Eecrical 1240% 822 Total Mechanical&Electrica 69 50 292 34.10 3915 31 10 3100 530 0010 LBRARES SE RK112 8320 106 135 Tetai oriect oests Msony 585 7.30 945 0020 CE 18 3 58% $50% 0600 476 060 l1.90% Equipment Plunbing Heatrng veniling, i coing Electrical Tota Mechanical&Electrical 120 324 505 120% 1800 28% 450 2720 326 475 640 34% 5 70 460% 4.90 2770 720 1220 1590 J0 70% 8.55 060 1375 8.30% 2900 12 2455 4220 1890 3100 33.70 96 90 25.30 2760 540 O010 LMING ASSISTED Total project cests SF RK101 8480 l14 10 0020 CE 705 8.05 950 380 0500 283 SE 240 313 32% Masonry Eqipment Punbing 240% 210N% 1800 2.06 24 240% 250 2720 6.85 915 970 060 8.80% 2770 Heating verting ir condiing Electrical 8.10 850 9.35 790 9.70 8.05 2900 915 1020 9308 1040% 10,70 Tta: Mechanical&Electrica 23.10 27.10 3015 2790 3100 3010% 32 550 0010 MEDICAL CLINICS SF 8185 101 127 RK10 Total project costs Equipment Pubing Heatng ventlaing ar condtoning 610 190 1055 0020 224 735 180% SF 471 5.20% 130 1800 840% 2720 550 7.75 1040 610 JO% 6 55 8.50 130% 1265 6 70 2770 96 6.95 495 1315 810% 200 Bectrical 12 20 Total echanical&Electrica 27.60% 34 30 21.85 30,75 43 228 See aiso dision 11700 570 0010 MEDICAL OFFICES 3500 570 76 85 95 25 SF RK11 CF 50 185 1075 O020 Total project costs Equpment Pumting Heating vetlating ar condtoning 7.30 SE 271 510 360% 5.90% 1.20 1800 680% 8 60 431 6.65 9 570% 2720 7.65 620 520 9.95 9.70 2770 2900 3100 6 10 15 15 8.90 2175 980% 1240 760% I140S ectrical 32 35 Totak Nechanical&Electrical 850 24.90 225 11S Square Foot Base Size Building Type Building Type Apartments, Low Rise Apartments, Mid Rise Apartments, High Rise Auditoriums Auto Sales Banks Median Cost per S.F $ 58.80 74.30 85.25 98.40 60.85 132.00 88.85 88.60 Typical Range Gross S.F 9,700 32,000 100,000 Libraries 95,000 7,600 10,800 2,500 2,000 4,500 6,000 13,500 Offices, High Rise 12,80039,400 Police Stations 15.000 16,600 16,000 85,000 Religious Education 5.300 17.800-106,000 Restaurants Median Cost per S.F $180.00 106.00 101.00 95.25 72.95 95.05 Typical Range Gross S.F. 5.500-145,000 7,000 Typical Size Gross $.F. 21,000 50,000 145,000 25,000 20,000 4,200 17,000 6,500 10,000 28,300 50,000 45,600 33,400 9,400 32,400 Typical Size Gross S.F 40,000 12,000 7,200 6,000 37,200 Jails 31,000 600,000 Medical Clinics 39,000 Medical Offices 28,600 Motels 7,500 Nursing Homes 42,000 Offices, Low Rise 15,000 Offices, Mid Rise 4,200 15,700 4,000 15,000 15,800 120,000 15.000 . 40,000 23,000 20.000 37,000 80,000 Churches Clubs, Country Clubs, Social Clubs, YMCA Colleges (Class) Colleges (Science Labl College (Student Union) Community Center Court Houses 79.45 83.45 5,000 20 000 300,000 120.000 800,000 4,000 . 120,000 260,000 10,500 12,400 7,500 9,000 19,000 4,400 86.20 86.40 116.00 169.00 129.00 92.60 126.00 107.00 133.00 19,000 30,000 150,000 Post Offices 80,000 Power Plants 6,800 1,000 98.40 733.00 81.50 139.00 119.00 20,000 6.000. 12,000 16,700 Research 6.300 45,000 2,800 6,000 Design& Engineering General Conditions RH1010-200 Table H1010-201 Architectural Foes proportionately. For alterations, add 50 % to the fee for the first $500,000 of project cost and add 25 % to the fee for project cost over $500,000. Tabulated below are typical percentage fees by project size, for good professional architectural service. Fees may vary from those listed depending upon degree of design difficulty and cconomic conditions in any particular area Architectural fees tabulated below include Structural, Mechanical and Electrical Engineering Fees. They do not include the fees for special consultants such as kitchen planning, security, acoustical, interior design, Rates can be interpolated horizontally and vertically. Various portions of the same project requiring different rates should be adjusted etc. Total Project Size in Thousands of Dollars 500 Building Types Factories, garages, warehouses, repetitve housing Apartments, banks, schools, lbraries, offices, municipal buildings Churches, hospitals, homes, laboratories, museums, research Memorials, monumental work, decorative furnishings 5,000 100 250 1,000 10,000 4.9% 50,000 4.5% 9.0% 6.2% 5.3% 8.0% 7.0% 9.2 12.2 12.3 8.0 7.0 6.6 6.2 15.0 13.6 16.0 12.7 11.9 9.5 8.8 8.0 14.5 13.1 10.0 9.0 8.3 City Cost Indexes RJ1030-010 Building Systems NE HCKALL NO SURUCTU SL Sp Er ou LDING SYSTEMS OHENECTD TOAL TOIA J045 100 959 54 1262 478 S29 152 4 2 96 1476 32 176 147A NTERORS C en 956 DRO-40Mec 3 O12 003 958 963 967 080 Dectrc EQUPMENT&FURNSHIGS 000 E 1802 47 BULDNG SITEMORK MEGHD AVEAGE 708 07 2 975 BNG SYSTEM PENSACOL OTAL UUSE NAC TOAL MA 9EL Set S16 708 009 4 14 546 s32 22 317 62 2 %4 2 S45 736 Reig 967 830 %3 105 TON 999 S 53 C NTORS 24 B16 C20-4 050 chical Ec E 274 63 62 89 545 87 754 999 976 1000 167 53 S4 44 S45 EQUPMENT&RURNSHeG BUNG STEWORK WEIGHTED AVERAGE 1000 1294 100 272 54 000 67 64 7.3 41 HLADEH BDNG SYSTEMS TORK OAL TAL MA TOL SUBCR S Spenct E 830 1245 1259 180 1286 3049 871 4 156 29 0 2 83 82 83 954 1085 SE8 1OR3 12 00 cng INERORS MCEE Coveng 105 974 00 44 057 52 %3 2 982 82 020-40chic JO03 226 307 03 979 1300 %1 573 985 %7 1000 82 957 951 050 63 00 83 300 1 1275 47 32 Ectic EQUPMENT&RURNSHINGS BULDING STONORK WEGHTED AVERAGE 972 00 000 42 057 %0 2 1OLE 2 Size Factor 60 70 90 10 3.0 +12 12 115 Cost Modifier Curve L15 L1 1.05 106 1.0 10 95 96 Area Conversion Scale 90 90 85 85 80 50 7080 90 10 20 30 Cost Multiplier 20 RL1020-200 Partition/Door Guidelines Reference Aids Table L1020-201 Partition/Door Density dgType Sorles Pario/Dty 990 Deo Desorption of Paron Pste,wod doors& Aartents ry 2y 90/ 80S 90 8EAF Dr wod s wod doors& r Pte, wood st, wod doors&tin Pa, netal st wood doors &tim D eta h wood dors&t Canc bleck pant, door&drywal wood std Con bock pat, door &drya wood stads Paste, woad sh d 9A 99AF 3ry 80 SE 500 500 SE 200 S 150 SF 500 S 50E/ 150 SEo 615 dary 1 stry 8 SFAF 50 SPA 50 SELF 20 SA 5 SEAF 50 SEAF 50FZ1 15SEAF ary 2tn Brk 24 ny story Past, nea wood doos&t Conc biock, dywal neta th, wood i Conc beck, wood &metal doors wood t Conc biock, cea te wood t Dwall on neta Concete blck, pated &o Concete bleck gad e imted coer don Drwal a sh, wood doors& 30% cancte ock, % dywood studs Paster, concree ock, wod doors&t Paster corte blodk, wood doors &tm Pacter, conce oc wod doos &tim Paster on concete ech&wood span Paster wood pareing& wood doors 5O% con beck 50% oyw wod th Paster, coc ood s& oting Plart bong Any Bs l story y Canery Car Nash Lary Part Departmet Store story stry 10 SA 60 SEAF 60 SA story 1 shry 600 600 E 25 e 2 sry 35 615 Comtry 90 9SEAF 15EAF 14EAF Fneral one 1 story 2 story 1 story 140 SFo 300 SEo 90 S 90 S Carage Sales&Sere 30 SEA 9AF obel 95 9FAF Paster, co eck wood doors&t w wood th od doo& yw wod shs, wood doors&m w nt wood doors&i by wood shs, wood dos & Canote teck dywl on netl , wood pareig Cancee bock, wood me b Can ockwood ney Carce bock wood n Drywl wod oors& Dyw wod doos& cote bock, 7ON ayw owod stats 30% conte bck 7N dy n 3%cone bck 70% nole ations % coe bck, 70 noable pation 3%conste eck 70N noate prions Sr and ele nc y Sr and er cosres only 25 SA Landomat Vedcal Cs stoey 694 6AF 79 7SFAF 18 SAF 1 sry 24 n 1 story 23 on I sry Mee Thee 200600 sa 200 250 9 601400 seat 20 SFAF 25 EAF 8SEAF 8A 209 20EA 20U 140122000 sa rng Home 1 ry 24 tory 1 stry 80 20050/m 300500 E 200500 E 200500 E 200500 / 600 SF 600 ce 2 story 35 610 ty 1120 28 ny 28 on I ny 20SU 20A 60SEAF 60 Pang Rane pe Pakng grage Prengnered See Drywa an mel swd s&t 600 60 SEA 15 SEA 1 50 / 130 / Can bk novble wood partton Sop rhone I ry 15 Mouble wod parons Cante bock, netl ad wood doors Can block e ad wood doors Cooete bock, wood and t Dryw meta s, cwanc&pa Canete bock pareing wood shs&tin Rade&TV ktr I ry 25 SEAR 40 SEU 15 SAU 18 25 25A 250 S 400 E ece estar Ce&Driee tart n 250 250 240 SE 600 150 S 150 S 150 Restarat wth g Spper Cub Br or Lounge etaeo Service St 1n Canoee bockpaing wood & Pad gn woded Drywal nea th ood doors&t Canete back, pat, do&dy wood teh Canoete bock, pairt do&dyw wood Dralwod sweod dors& Drywal metal stas,wood doons& 5N ctebock sON y wood stas 50% conte bck, 5ONy wood sd Conoete bck dwalwod shawd Paser, metal sah wood dours &tin Pade net u wood dors&i Pa, ta wood doars &tin Concete ck pt, dyw&pon pae 24 SEAF 60SEAF Masowy 15 SA anl I5 SEAF Fmer 15 SA Shopping Center 300 400 400 SE 300 S 1stry I stry 2 ry 40 SFLF 30 SEL 0 SE O SFLF 10 SE Seul Fand Stm Store Apt above 2 try 2ry 3try Masoy Fme 100 SE 100 SE Fre Spmaets Thck em try FIGURE 6.11. This table is useful for quickly and accurately determining partition and door quantities during design From R. S. Means Assemblies Cost Deta 2009. O R. S. Means Co., Inc, Kingston, MA, 781-422-5000, all rights reserved. K1010 S.F, C.F. and % of Total Costs UNIT COSTS OF TOTAL K1010 S.F.&C.F. Costs UNT MEDIAN 14 14 MEDAN 34 28 80% 510 510 300 SE RK101 825 115 1480 990% 2590% 10 520 0010 JAILS 520 14 180 232 RK101 010 Total project costs Equipment Pumbing Heating,venkting, r condioning CE 5.85 SE 1315 16.15 205 0020 96.10 940 1800 27.35 43 15 20 1420 8.05 2380 2720 7% 8.90% 13.80% 9.40% 17.109 12.50 16.80 3245 750% 2770 15 35 9.70 2440 810% 1140% 200 Eecrical I240% 822 3100 Total Mechanical&Electrica G9 50 29 2 34.10 3915 31 10 530 O010 LBRARES 8320 135 SE RK1012 106 410 Tetai oroiect oosts Mesonry 585 945 0020 CF 7.30 58 0600 18 3 $50 SF 476 060 l1.90% Equipment Plunbing Heating veialdig, i codiong Electrical Tota Mechanical&Electrical 120 324 505 12% 1800 28% 450% 2720 326 475 640 34% 5 70 4.90 2770 720 1220 1590 460% 30.60 J0 70% 2900 855 1375 830% 128 2455 4220 1890 3100 33.70 96.90 25.30 2760 540 O10 LMING ASSISTED Total project cests SF FK101 CE 848 l14 10 0020 705 805 950 380 0500 283 32% SF 240 313 Masonry Eipment Pumbing Heating verlting, ir condiing Electrical 240% 210N 1800 2.06 24 240% 250 6.85 2720 915 970 060 2770 8.10 850 935 790 8.80% 9.70 8.05 23.10 2900 915 1020 9308 1040 10,70 Tta: Mechanical&Electrica 2.0 3015 2790% 3100 3010% 32% 550 0010 MEDICAL CLINICS S.F 8185 101 127 RK10 Total project costs Equipment Punbing Heating ventleing air condtioing Electrical Tota Nechanical&Electrical 610 224 190 1055 0020 7.35 180% 1800 SF 471 5.20% 130 840% 2720 550 7.75 1040 6J0% JO% 6 55 8.50 1265 130% 12 20 34 30 6 70 2770 96 6.95 495 1315 810% 200 0% 2760% 300 21.85 30,75 43 225 See aiso dision 11700 570 0010 MEDICAL OFFICES 3500 570 76 85 95 25 SF RK101 CF 570 185 1075 O020 Total project costs Equipment Pumting Heating vetlating ar condtioning Becical 7.30 SE 271 510 360% 590% 120% 1800 9 680% 431 6.65 5,70% 8.60 2720 620 520 ,65 9.95 9.70 2770 8.90 2175 610 1240 160 980% 1140 2900 3100 15 15 32 35 Total Nechanical&Electrical 18 50% 228 24.90% 111S