Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding 3,100 $ 12,400 Fabrication 1,860 $ 18,600 Total

image text in transcribedimage text in transcribed

Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding 3,100 $ 12,400 Fabrication 1,860 $ 18,600 Total 4,960 $ 31,000 $ 1.40. $ 2.20 Direct materials $ Direct labor cost Job P 16,120 $ 26,040 Job Q $ 9,920 $ 9,300 Actual machine-hours used: Molding 2,160 990 Fabrication 740 Total 2,900 1,070 2,060 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1 to 9, assume that Sweeten Company uses departmental predetermined overhead rates with machine- hours as the allocation base in both departments and Job P included 20 units and Job Q included 30 units. For questions. 10 to 15, assume that the company uses-a plantwide predetermined overhead rate with machine-hours as the allocation base. 4. What was the total manufacturing cost assigned to Job P? (Do not round intermediate calculations.) Answer is complete but not entirely correct. Total manufacturing cost 20,692 Prov 4 5 6 10 of 10 www Next > Estimated total machine-hours used. Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding 3,100 $ 12,400 Fabrication Total 1,860 $ 18,600 4,960 $ 31,000 $ 1.40 $ 2.20 Direct materials Job P $ 16,120 Job Q $ 9,920 Direct labor cost $ 26,040 $ 9,300 Actual machine-hours used: Molding 2,160 Fabrication Total 740 2,900 990 1,070 2,060 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1 to 9, assume that Sweeten Company uses departmental predetermined overhead rates with machine- hours as the allocation base in both departments and Job P included 20 units and Job Q included 30 units. For questions 10 to 15, assume that the company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. 6. What was the total manufacturing cost assigned to Job Q? (Do not round intermediate calculations.) Answer is complete but not entirely correct. Total manufacturing cost 18,400

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting for Non-Accounting Students

Authors: John R. Dyson

8th Edition

273722972, 978-0273722977

More Books

Students also viewed these Accounting questions