Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Direct materials Direct labor cost Job P $30,000 Job
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Direct materials Direct labor cost Job P $30,000 Job Q $16,500 $34,600 $14,300 Actual machine-hours used: Molding 3,400 2,500 Fabrication 2,300 2,600 Total 5,700 5,100 Molding Fabrication Total 2,500 $14,250 1,500 $ 17,550 4,000 $31,800 $ 3.10 $ 3.90 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 11. How much manufacturing overhead was applied from the Fabrication Department to Job P and how much was applied to Job Q? (Do not round intermediate calculations.) Job P Job Q Manufacturing overhead applied
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started