Figure 1 below shows a five-bus power system network in Selangor. Both sources are 132 kV source. The bus data is given in Table
Figure 1 below shows a five-bus power system network in Selangor. Both sources are 132 kV source. The bus data is given in Table 1. Source 1 (H) Load 1 Bus 1 From Bus 1 1 2 2 3 4 Bus 2 To Bus 2 3 4 5 4 5 Load 2 Bus 3 Figure 1: Power System Network Table 1: Bus Data Positive Sequence X1 (p.u) 0.6 0.24 0.18 0.12 (H) Source 2 0.3 0.24 Load 3 Bus 5 Zero Sequence X0 (p.u) 0.15 0.6 0.45 0.3 0.075 0.6 Bus 4 A new shopping complex is proposed to be developed in the area. A feasibility study must be conducted to propose the best location for the new complex. Propose the best location for the development (either Bus 2, Bus 3 or Bus 4) with appropriate consideration for culture, society, and environment. The information on the location of the three busses are as follows: Bus 2: Near the beach area where the community will spend their time with families. Bus 3: In the middle of the town area. Bus 4: Suburb area near a hill and forest. After you have chosen the appropriate area, you are required to evaluate the circuit breaker ratings for the 132/11 kV transformer and circuit breaker that will be connected to the new developing area.
Step by Step Solution
★★★★★
3.48 Rating (151 Votes )
There are 3 Steps involved in it
Step: 1
Based on the given data we have a fivebus power system network in Selangor with two 132 kV sources The network includes three loads denoted as Load 1 Load 2 and Load 3 and five buses denoted as Bus 1 ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started