Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Flexible Budgets, Direct - Cost Variances, and Management Control Flexible Budget Brabham Enterprises manufactures tires for the Formula I motor racing circuit. The company's budgeted

Flexible Budgets, Direct-Cost Variances, and Management Control
Flexible Budget
Brabham Enterprises manufactures tires for the Formula I motor racing circuit. The company's budgeted and
actual amounts are as follows:
Use the blue shaded areas on the ENTERANSWERS tab for inputs.
Always use cell references and formulas where appropriate to receive full credit. If you
copy/paste from the Instructions tab or type the numbers in, you will be marked
wrong.
Requirement
Prepare a performance report that uses a flexible budget and a static budget.
a. Enter all amounts as positive values. Do NOT use parentheses or a minus sign for amounts to be subtracted.
b. Use the ABS function when calculating variances, and use the drop-down selections for F(favorable) or
U(unfavorable) when describing the variances.
c. For variances with a zero amount, make sure to enter the result of "=0" in the appropriate cell and
leave the drop-down to identify the variance as either F or U blank.
Prepare a performance report that uses a flexible budget and a static budget.
a. Enter all amounts as positive values. Do NOT use parentheses or a minus sign for amounts to be subtracted.
b. Use the ABS function when calculating variances, and use the drop-down selections for F(favorable) or U
(unfavorable) when describing the variances.
c. For variances with a zero amount, make sure to enter the result of "=0" in the appropriate cell and leave the
drop-down to identify the variance as either F or U blank.
(Always use cell references and formulas where appropriate to receive full credit. If you copy/paste from the
Instructions tab or type the numbers in, you will be marked wrong.)Flexible Budgets, Direct-Cost Variances, and Management Control
Flexible Budget
Brabham Enterprises manufactures tires for the Formula I motor racing circuit. The company's budgeted and
actual amounts are as follows:
Use the blue shaded areas on the ENTERANSWERS tab for inputs.
Always use cell references and formulas where appropriate to receive full credit. If you
copy/paste from the Instructions tab or type the numbers in, you will be marked
wrong.
Requirement
Prepare a performance report that uses a flexible budget and a static budget.
a. Enter all amounts as positive values. Do NOT use parentheses or a minus sign for amounts to be subtracted.
b. Use the ABS function when calculating variances, and use the drop-down selections for F(favorable) or
U(unfavorable) when describing the variances.
c. For variances with a zero amount, make sure to enter the result of "=0" in the appropriate cell and
leave the drop-down
to identify the variance as either F or U blank.
MetaBrabham Enterprises manufactures tires for the Formula I motor racing circuit. The company's budgeted and actual amounts are as follows:
Budgeted for August 2020
Units to manufacture and sell 3,000
Variable cost per tire $73
Total fixed costs $57,000
Budgeted selling price per tire $111
Actual Results for August 2020
Units manufactured and sold 2,700
Selling price per tire $113
Total variable costs $218,700
Total fixed costs $53,500Prepare a performance report that uses a flexible budget and a static budget.
a. Enter all amounts as positive values. Do NOT use parentheses or a minus sign for amounts to be subtracted.
b. Use the ABS function when calculating variances, and use the drop-down selections for F(favorable) or U
(unfavorable) when describing the variances.
c. For variances with a zero amount, make sure to enter the result of "=0" in the appropriate cell and leave the
drop-down to identify the variance as either F or U blank.
(Always use cell references and formulas where appropriate to receive full credit. If you copy/paste from the
Instructions tab or type the numbers in, you will be marked wrong.)
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing And Assurance Theory And Practice

Authors: Clifford Gomez

1st Edition

8120345665, 978-8120345669

More Books

Students also viewed these Accounting questions