Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

General Specifications The organization for which you will be building a topology consists of one campus comprised of two buildings connected by a fibre-optic network:

General Specifications The organization for which you will be building a topology consists of one campus comprised of two buildings connected by a fibre-optic network:

o Business headquarters

o Engineering and test

The network uses the base IP network address: 10.xx.0.0/16 where xx is the last two digits of your student number.

The business headquarters building has the following departments: o Finance o HR o Operations o Customer Service o Business datacenter The engineering and test building has the following departments:

o Engineering

o Test

o Engineering datacenter

Staff and Guest WiFi is present in both buildings

The headquarters building has the only Internet connection o The network to the ISP is 201.202.xx.48/30 where xx is the last two digits of your student number o The IP address of the ISP router is 201.202.xx.49/30 |2

Task 1 - Topology Build You must build a topology in Packet Tracer to reflect your solution to the requirements. Note that you will need to complete some of the later tasks to finish this one.

Components to use: Edge/Access switches: 2960 Distribution switches: 3650 Using a 3650 is different than we have done in the past when weve used a 3560 for distribution. There are two reasons for that. One is the IOS version is newer on the 3650, which makes the command output more consistent. Second is the 3650 has 1Gbps ports which means the uplinks can be gigabit. Before you configure a 3650, you must power it on. That involves dragging a power supply to the empty slots in the Physical view. Routers: 2911 Endpoints: Generic PCs Requirements:

The headquarters must have three edge switches: one dedicated to the business datacenter and two for everything else.

The engineering and test building must have three edge switches: one dedicated to the engineering datacenter and two for everything else.

Both buildings will have a distribution switch.

The edge switches at both buildings will connect to their respective distribution switches using a twointerface bonded channel.

The distribution switches will be connected to each other using a two-interface bonded channel.

The headquarters building will have a single router, that provides a connection to the Internet, connected to the distribution switch using a two-interface bonded channel

. The ISP will have one router with a single interface connection to the headquarters building router

. All network device names must contain your initials as they appear on the class list (e.g. BusinessHQSWEdge01-MK). Device names missing this requirement will constitute a major error

. All hostnames must match the device names.

Endpoints are not required, but you may create what you feel you need for testing to ensure everything works correctly.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Computer Aided Database Design

Authors: Antonio Albano, Valeria De Antonellis, A. Di Leva

1st Edition

0444877355, 978-0444877352

Students also viewed these Databases questions

Question

In a command system:

Answered: 1 week ago