Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Geo Tire manufactures tires for all-terrain vehicles. Geo uses job costing and has a perpetual inventory system. On September 22, Geo received an order for

image text in transcribed

Geo

Tire manufactures tires for all-terrain vehicles.

Geo

uses job costing and has a perpetual inventory system. On

September

22,

Geo

received an order for

180

TX tires from ATV Corporation at a price of

$80

each. The job, assigned number 298, was promised for

October

10. After purchasing the materials,

Geo

began production on

September

30 and incurred the following direct labor and direct materials costs in completing the order:

LOADING...

(Click the icon to view the costs.)

Geo

allocates manufacturing overhead to jobs on the basis of the relation between expected overhead costs

($410,000)

and expected direct labor hours

(20,500).

Job 298 was completed on

October

3 and shipped to ATV on

October

5.

Requirement 1. Prepare a job cost record for Job 298.

Calculate the predetermined overhead rate, then apply manufacturing overhead to the job. Begin by identifying the formula and computing the predetermined overhead rate.

=

Predetermined overhead rate

Part 2

=

per hour

Part 3

Complete the job cost record in order of direct materials, direct labor, and allocated manufacturing overhead. Then prepare the overall cost summary. (List the dates in chronological order. Enter the labor time records in the correct row according to date. If an input field is not used in the table, leave the input field empty; do not enter a zero.)

Job Cost Record

Job No.

298

Customer Name

ATV Corporation

Job Description

180 TX tires

Date Promised 10-10

Direct Materials

Requisition

Date

Number

Amount

20XX

Totals

Date Started 9-30

Direct Labor

Labor Time

Record

Number

Amount

Date Completed 10-3

Manufacturing Overhead Allocated

Date

Rate

Amount

per

direct labor hr.

Overall Cost Summary

Direct Materials

Direct Labor

Manufacturing Overhead

Allocated

Total Job Cost

Part 4

Requirement 2. Calculate the total profit and the per-unit profit for Job 298. (Round your answer to two decimal places.)

Job 298

Sales

Less: Cost of job

Total profit on job

Number of tires

Per-unit profit

tion 3

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting And Analysis In Multinational Enterprises

Authors: H P Holzer

1st Edition

3110100819, 978-3110100815

More Books

Students also viewed these Accounting questions

Question

600 lb 20 0.5 ft 30 30 5 ft

Answered: 1 week ago