Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports

image text in transcribed
image text in transcribed
image text in transcribed
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge $ 9,300 6.200 Direct materials Direct labor Overhead (300 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) 18,600 $34,100 10,600 ft. Squared Edge Total $21.500 11.00 18.000 35,400 $103,100 14,100 ft. Glassworks's controller wishes to apply activity based costing (ABC) to allocate the $54,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information $ Overhead Cost Category (Activity cost Pool). Supervision Depreclation of machinery Assembly line preparation Total overhead 2.16 28,40 $ 54,000 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. Round activity rate and cost per unit answers to 2 decimal places.) used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Direct labor cost (5) Machine hours Setups (number) Rounded Edge $6,280 40 hours 30 times Squared Edige $11,800 700 hours 93 times Total $18,000 1,100 hours 123 times Required: Activity Rate 1. Assign these three overhead cost pools to each of the two products using ABC. Activity Overhead Cost Activity Drivers Supervision Direct labor cost Depreciation of machinery Machine hours Assembly line preparation Setups Rounded edge Activity driver incurred Overhead assigned Activity rate 0 % Supervision Depreciation of machinery Assembly line preparation Squared edge Activity rate Activity driver incurred Overhead assigned Rounded edge Activity rate Activity driver incurred Overhead assigned Supervision Depreciation of machinery Assembly line preparation Activity rate Activity driver incurred Overhead assigned Squared edge Components - Supervision Depreciation of machinery Assembly line preparation 2. Determine average cost per foot for each of the two products using ABC. Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial And Manag Acct Ed7 Sg M1 M13

Authors: Carl S. Warren, James M. Reeve, Philip E. Fess

7th Edition

0324054610, 978-0324054613

More Books

Students also viewed these Accounting questions

Question

1. Identify three approaches to culture.

Answered: 1 week ago

Question

2. Define communication.

Answered: 1 week ago