Question
Harpers's Co. Job 501 for the manufacture of 2,200 coats which was completed during the month of August at the unit costs presented below. Final
Harpers's Co. Job 501 for the manufacture of 2,200 coats which was completed during the month of August at the unit costs presented below. Final inspection of Job 501 disclosed 200 spoiled coats which was sold to a jobber for P6,000. Direct Materials 20 Direct Labor 18 Factory Overhead 18 Total 56
The factory overhead includes an allowance of P1 for spoiled work. Assume that the spoilage loss is charged to all production during August. What would be the unit cost of the coats produced for Job 501? a. 53.00 b. 55.00 c. 56.00 d. 58.60
Using the same information in the preceding number, assume instead that the spoilage loss is attributed to the exacting specifications of Job 501 and is charged to this specific job. What would be the unit cost of the coats produced for Job 501? a. 55.00 b. 57.50 c. 58.60 d. 61.60
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started