Question
Hickory Company manufactures two products14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct
Hickory Company manufactures two products14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: |
Activity Cost Pool | Activity Measure | Estimated Overhead Cost | Expected Activity | ||
Machining | Machine-hours | $ | 203,000 | 10,000 | MHs |
Machine setups | Number of setups | $ | 121,900 | 230 | setups |
Production design | Number of products | $ | 87,000 | 2 | products |
General factory | Direct labor-hours | $ | 379,500 | 12,000 | DLHs |
Activity Measure | Product Y | Product Z |
Machine-hours | 7,300 | 2,700 |
Number of setups | 50 | 180 |
Number of products | 1 | 1 |
Direct labor-hours | 9,500 | 2,500 |
11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) 14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.) 15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started