Question
I copy and pasted the information. The question I have is for the R.P.M; Is the distribtuion normal? If it's not normal, what is the
I copy and pasted the information. The question I have is for the R.P.M;
Is the distribtuion normal?
If it's not normal, what is the shape?
Explain your decision on acceptability.
Objective: |
|
|
|
|
|
|
|
|
|
So far, so good. The process has been in control for the past four months. Phyllis isn't |
|
|
|
|
|
|
|
|
|
as well versed in Six Sigma as the team is, and it is her nature to question everything. |
|
|
|
|
|
|
|
|
|
So she has asked for a capability study to be performed on two key process factors that |
|
|
|
|
|
|
|
|
|
affect leveler thickness and wants to see this for the past 35 days of production. |
|
|
|
|
|
|
|
|
|
You are on the spot, but confident. You pull up the past 35 day's worth of data and you |
|
|
|
|
|
|
|
|
|
calculate Pp and Ppk for each of these factors. Is Phyllis going to be happy or is she |
|
|
|
|
|
|
|
|
|
going to be more skeptical? That is the 'question of the day.' |
|
|
|
|
|
|
|
|
|
Crunch the numbers--and you will find out. By the way--finish this deliverable correctly |
|
|
|
|
|
|
|
|
|
AND MAKE ALL OF THE CORRECTIONS REQUIRED ON THE PREVIOUS ASSIGNMENTS |
|
|
|
|
|
|
|
|
|
and you are finished with the project! Congratulations!!! |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions for you: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| "Is it possible for me to do a self-check?" |
|
|
| |||
Instructions for you: |
|
|
|
|
|
|
|
| |
1. Construct histograms for each of the parameters. Note: The |
|
|
|
|
|
|
|
|
|
first parameter 'thickness' is the product parameter. |
|
|
|
|
|
|
|
|
|
The second parameter is thought to affect thickness. |
|
|
|
|
|
|
|
|
|
2. Are the processes approximately normally distributed? |
|
|
|
|
|
|
|
|
|
3. Calculate Pp and Ppk for each. Note: The upper and lower specifications |
|
|
|
|
|
|
|
|
|
are listed at the bottom of each column. You will need these to do the calculations. |
|
|
|
|
|
|
|
|
|
4. Are the processes acceptable? |
|
|
|
|
|
|
|
|
|
| "I'm lost" |
| "Can I do this with the Data Analysis Toolpak in Excel 2003?" | ||||||
|
|
| "Can I do this with the Data Analysis Toolpak in Excel 2007?" | ||||||
|
|
|
|
|
|
|
|
|
|
Data: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Data: | Thickness | R.P.M. |
|
|
|
|
|
|
|
| 0.548 | 4400 |
|
|
|
|
|
|
|
| 0.550 | 4400 |
|
|
|
|
|
|
|
| 0.552 | 4400 |
|
|
|
|
|
|
|
| 0.554 | 4400 |
|
|
|
|
|
|
|
| 0.552 | 4450 |
|
|
|
|
|
|
|
| 0.547 | 4450 |
|
|
|
|
|
|
|
| 0.547 | 4450 |
|
|
|
|
|
|
|
| 0.552 | 4450 |
|
|
|
|
|
|
|
| 0.549 | 4450 |
|
|
|
|
|
|
|
| 0.548 | 4450 |
|
|
|
|
|
|
|
| 0.549 | 4450 |
|
|
|
|
|
|
|
| 0.549 | 4450 |
|
|
|
|
|
|
|
| 0.550 | 4450 |
|
|
|
|
|
|
|
| 0.551 | 4500 |
|
|
|
|
|
|
|
| 0.549 | 4500 |
|
|
|
|
|
|
|
| 0.550 | 4500 |
|
|
|
|
|
|
|
| 0.551 | 4550 |
|
|
|
|
|
|
|
| 0.550 | 4600 |
|
|
|
|
|
|
|
| 0.550 | 4650 |
|
|
|
|
|
|
|
| 0.553 | 4650 |
|
|
|
|
|
|
|
| 0.548 | 4650 |
|
|
|
|
|
|
|
| 0.552 | 4700 |
|
|
|
|
|
|
|
| 0.551 | 4700 |
|
|
|
|
|
|
|
| 0.550 | 4700 |
|
|
|
|
|
|
|
| 0.549 | 4700 |
|
|
|
|
|
|
|
| 0.551 | 4700 |
|
|
|
|
|
|
|
| 0.551 | 4700 |
|
|
|
|
|
|
|
| 0.550 | 4700 |
|
|
|
|
|
|
|
| 0.551 | 4700 |
|
|
|
|
|
|
|
| 0.550 | 4700 |
|
|
|
|
|
|
|
| 0.549 | 4700 |
|
|
|
|
|
|
|
| 0.550 | 4750 |
|
|
|
|
|
|
|
| 0.551 | 4750 |
|
|
|
|
|
|
|
| 0.549 | 4750 |
|
|
|
|
|
|
|
| 0.550 | 4800 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Thickness | R.P.M. |
|
|
|
|
|
|
|
Upper Specs | 0.5600 | 8000 |
|
|
|
|
|
|
|
Lower Specs | 0.5400 | 2000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
How to submit an Assignment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
YOU DO NOT NEED TO CREATE CONTROL CHARTS TO COMPLETE THIS ASSIGNMENT!! |
|
|
|
|
|
|
|
|
|
DO NOT SEND THE ACTUAL HISTOGRAMS UNLESS YOUR INSTRUCTOR ASKS YOU TO. |
|
|
|
|
|
|
|
|
|
Project: |
| Manufacturing 2015 |
|
|
|
|
| ||
Deliverable: |
| Pp Ppk |
|
|
|
|
|
| |
Student last name: |
| Perez |
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
INSTRUCTIONS: (1) IF YOU SAY THE DISTRIBUTION IS NOT APPROXIMATELY NORMAL, GIVE THE CORRECT NAME FOR THE PATTERN YOU SEE IN YOUR HISTOGRAM. (2) BASE YOUR DECISION ON ACCEPTABILITY ON THE ASSUMPTIONS AND CRITERIA FOR Pp and Ppk DISCUSSED IN THE RECORDED LECTURES AND VIRTUAL CLASSES ON CAPABILITY. YOU DO NOT NEED TO CREATE CONTROL CHARTS FOR THIS ASSIGNMENT!! |
|
| |||||||
|
| ||||||||
|
| ||||||||
|
| ||||||||
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
Thickness | Pp (use 6 decimal places) |
|
|
| 2.110000 |
|
| Check |
|
| Ppk (use 6 decimal places) |
|
|
| 2.090000 |
|
|
|
|
| Is this distribution approximately Normal? |
|
|
| YES |
|
|
|
|
| If it's not normal, what is the shape? | N/A |
| HINT! |
| ||||
| Is this process acceptable? |
|
|
| YES |
|
| HINT! |
|
| Explain your decision on acceptability. |
|
|
| The Pp and Ppk fall into between the upper and lower specs. | HINT! |
| ||
|
|
|
|
|
|
| |||
Round your Pp and Ppk results to 6 decimal places. |
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
R.P.M. | Pp (use 6 decimal places) |
|
|
| 7.550000 |
|
| Check |
|
| Ppk (use 6 decimal places) |
|
|
| 6.500000 |
|
|
|
|
| Is this distribution approximately Normal? |
|
|
| No |
|
|
|
|
| If it's not normal, what is the shape? |
|
| HINT! |
| ||||
| Is this process acceptable? |
|
|
| YES |
|
| HINT! |
|
| Explain your decision on acceptability. |
|
|
|
| HINT! |
| ||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started