Answered step by step
Verified Expert Solution
Question
1 Approved Answer
I just need help with throughout time month 5 and 6 manufacturing (MCE) month 5 and 6 Tombro Industries is in the process of automating
I just need help with throughout time month 5 and 6
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months 9 days Month Quality control Number of detecta 188 166 127 Hamber of warranty claims 50 49 42 33 Number of customer complaints 30 105 99 82 61 Material control mates Parchase order lead time 10 day 7 days Serap percent of total cost 5 days 10 10 25 Machine per tornare esses 30 Kachine downtime as a percentage of availability 40 50 58 Une as a percentage of availability 84 950 928 899 855 Betup Line (hors) 10 12 13 14 Delivery performance sure Throughout time 2 7 2 2 Manufacturing eyele efficiency (MCE) 2 7 7 Delivery eyele time Percentage of on-time deliver les 968 951 920 The president has read in industry Journals that throughput time, MCE, and delivery cycle time are important measures of performance, but no one is sure how they are computed. You have been asked to assist the company, and you have gathered the following data relating to these measures Average Month (in daya 1 3 4 wait tine per ordet before start of peoduction Esapeetonte per unit Process the per unit Que tine Pet No time per unit 0.7 11.2 0.6 2.4 12.0 0.6 1. 6.0 0.6 14.0 0.6 1.0 7.6 0. 2.1 0.4 0.6 Required: 1. Compute the throughout time for each month 1-b. Compute the manufacturing cycle efficiency (MCE) for each month 1-c. Compute the delivery cycle time for each month 3-a. Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 5 the inspection time, process time, and so forth, are the same as for month 4, except that the company is able to completely eliminate the queue time during production using Lean Production Compute the new throughput time and MCE 3-b. Refer to the inspection time, process time, and so forth. given for month 4. Assume that in month 6 the inspection time, process time, and so forth, are the same as in month 4, except that the company is able to eliminate both the queue time during production and the inspection time using Lean Production Compute the new throughput time and MCE Complete this question by entering your answers in the tabs below. Required 1 Required 3 3-a. (Month 5) Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month the Inspection time, process time, and so forth, are the same as for month 4, except that the company is able to completely eliminate the queue time during production using Lean Production. Compute the new throughput time and MCE. 3-b. (Month 6) Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 6 the Inspection time, process time, and so forth, are the same as in month 4, except that the company is able to eliminate both the queue time during production and the inspection time using Lean Production. Compute the new throughput time and MCE. (Round your answers to 1 decimal place.) Show less Throughput time Manufacturing cycle efficiency (MCE) Month 5 days % Month 6 days % manufacturing (MCE) month 5 and 6
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started