Answered step by step
Verified Expert Solution
Question
1 Approved Answer
I need solution Required information The following information applies to the questions displayed below AccuSound Corporation manufactures printed circuits for stereo amplifiers. A common product
I need solution
Required information The following information applies to the questions displayed below AccuSound Corporation manufactures printed circuits for stereo amplifiers. A common product defect is a percent testing program can be reworked to acceptable levels if the defect is drift. However, in a recent drift" caused by failure to maintain precise heat levels during the production process. Rejects from the 100 analysis of customer complaints, Marie Allen, the assistant controller, and the quality control engineer determined that normal rework does not bring the circuits up to standard. Sampling showed that about haif of the reworked circuits will fail after extended amplifier operation. The incidence of failure in the reworked circuits is projected to be about 10 percent over five years Unfortunately, there is no way to determine which reworked circuits will fail, because testing will not detect the problem. The rework process could be changed to correct the problem, but the cost-benefit analysis for the suggested change indicates that it is not economically feasible. AccuSound's marketing analyst has indicated that this problem will have a significant impact on the company's reputation and customer satisfaction. Consequently, the board of directors would interpret this problem as having serious negative implications for the company's profitability. Allen included the meeting of the board of directors. Due to the potential adverse economic impact, Allen foilowed a standing practice of highlighting this information. After reviewing the reports to be presented, the plant manager and his staff complained to the controller that he should control his people better. "We can'tu the board with this kind of material. Tell Allen to tone that down. Maybe we can get it by the board in thi meeting and have some time to work on it. People who buy those cheap systems and play them that loud shouldn't expect them to last forever." circuit failure and rework problem in her report prepared for the upcoming quarterly The controller called Allen into his office and said, "Marie, you'll have to bury this one. The probable failure of reworks can be mentioned briefly in the oral presentation, but it should not be mentioned or highlighted in the advance material mailed to the board" of 3 Allen feels strongly that the board will be misinformed on a potentially serious loss of income if she follows the controller's orders. Allen discussed the problem with the quality control engineer, who simply remarked, That's your problem, Marie. pped 3. Choose What should Marie Allen do? (You may select more than one answer. Single click the box with the question mark to produce a check mark for a correct answer and double click the box with the question mark to empty the box for a wrong answer. Any boxes left with a question mark will be automatically graded as incorrect.) Prnt Protect the interests of the company, others in the company, and herself. Allen must take some action to reduce her vulnerability. 2 Allen should write a report to the controller detailing the probable failure of reworks, the analysis made by her and the quaity control engineer, and the cantroller's instructions in this matterStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started