Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

In 2018, George Wright started the Old Oregon Wood Store to manufacture Old Oregon tables. Each table is carefully constructedby hand using the highest-quality oak.

In 2018, George Wright started the Old Oregon Wood Store to manufacture Old Oregon tables. Each table is carefully constructedby hand using the highest-quality oak. Old Oregon tables can support more than 500 pounds, and since the start of the Old Oregon Wood Store, not one table has been returned because of faulty workmanship or structural problems. In addition to

being rugged, each table is beautifully finished using a urethane varnish that George developed over 20 years of workingwith wood-finishing materials.

The manufacturing process consists of four steps: preparation, assembly, finishing, and packaging. Each step is performed by oneperson. In addition to overseeing the entire operation, George does all of the finishing. Tom Surowski performs the

preparation step, which involves cutting and forming the basic components of the tables. Leon Davis is in charge of the assembly,and Cathy Stark performs the packaging.

Although each person is responsible for only one step in the manufacturing process, everyone can perform any one of the steps. It is George's policy that occasionally everyone should complete several tables on his or her own without any help or assistance. Asmall competition is used to see who can complete an entire table in the least amount of time. George maintains average total andintermediate completion times. The data are shown in Figure 15.7.

It takes Cathy longer than the other employees to construct an Old Oregon table. In addition to being slower than the

other employees, Cathy is also unhappy about her current responsibility of packaging, which leaves her idle most of the day. Herfirst preference is finishing, and her second preference is preparation.

In addition to quality, George is concerned with costs and efficiency. When one of the employees misses a day, it causes majorscheduling problems. In some cases, George assigns another employee overtime to complete the necessary work. At other times,George simply waits until the employee returns to work to complete his or her step in the manufacturing process. Both solutionscause problems. Overtime is expensive, and waiting causes delays and sometimes stops the entire manufacturing process.

To overcome some of these problems, Randy Lane was hired. Randy's major duties are to perform miscellaneous jobs and to helpout if one of the employees is absent. George has given Randy training in all phases of the manufacturing process, and he is pleased with the speed at which Randy has been able to learn how to completely assemble Old Oregon tables. Randy's averagetotal and intermediate completion times are given in Figure 15.8.

image text in transcribed

Answer the following questions here and show your detailed work (solution) below the line for each part. If you worked on a spreadsheet, copy it under each part of your solution. Once finished, create a pdf file, and upload it on Blackboard.

Part 1: What is the fastest way to make the tablets using the original crew?

  1. Cathy-prep; Tom-assembly; Leon-finishing; George-packaging
  2. Leon-prep; Tom-assembly; George-finishing; Cathy-packaging
  3. George-prep; Cathy-assembly; Tom-finishing; Leon-packaging
  4. Tom-prep; Cathy-assembly; George-finishing; Leon-packaging

Part 2: Optimally, how many tables can be made per day using the original 4-person crew? (Assume 8 work hours per day.)

Part 3: If Randy performed one of the four functions and replaced Cathy (who would then perform miscellaneous duties), what would be the total production time, in minutes, per table?

Part 4: Assuming an 8-hour workday, what would the expected daily output of tables be if each of the 4 original crew members separately built entire tables by themselves?

Figure 15.7 Manufacturing Time in Minutes Figure 15.8 Randy's Completion Times in Minutes

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Successful Project Management

Authors: Jack Gido, Jim Clements

4th Edition

9780324656152, 324656130, 978-0324656138

More Books

Students also viewed these General Management questions

Question

Briefly describe the term operations management.

Answered: 1 week ago

Question

What should Dons next steps be? FPE.*

Answered: 1 week ago