In a job shop, effective capacity is only 38 percent of design capacity, and actual output is 58 percent of effective output. What design capacity
In a job shop, effective capacity is only 38 percent of design capacity, and actual output is 58 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?
a. The Design Capacity needed to achieve the required actual job outputs =Blank 1 (round to whole number)
b. The Effective Capacity needed to achieve the required actual job outputs = Blank 2 (round to whole number)
Step by Step Solution
There are 3 Steps involved in it
Step: 1