Question

1 Approved Answer

In Department 1, workers use a laser to precision cut all tubing based on the standard design. Workers then weld the precision cut pieces to

In Department 1, workers use a laser to precision cut all tubing based on the standard design. Workers then weld the precision cut pieces to form the bicycle frames and sand the joints to prepare the frames for painting.After sanding, workers hang the frames on an overhead conveyor that transports them through the next two processes.All bicycle frames undergo a high temperature heat-treating process to strengthen the tubing walls that are weakened during the welding process.After heat treatment, all frames are inspected.At this time, 100 percent of direct material and 70 percent of conversion work have been done.Defective frames are removed from the production process and destroyed.All frames passing this inspection will pass through an electrostatic painting process in which each frame receives an electrical charge that enhances paint adherence.The company's trademark color for the Tourist is purple.After painting, frames are sent to Department 2 for further processing.

In Department 2, workers assemble the bicycles. Each bike is inspected when each unit has received 100 percent of assembled components and conversion work.All bikes passing the final inspection are packed in a box and sent to the Finished Goods warehouse.

The product cost composition of the Tourist line consists of direct materials, direct labor, and manufacturing overhead.Each Tourist bike uses, on average, 2.5 direct labor hours in Department 1 and 1.5 direct labor hours in Department 2.

Manufacturing overhead are indirect costs to the product lines.Overheads are applied to production process in each department.The company has five overhead cost pools: (1) material handling, (2) labor-related, (3) heat treatment, (4) painting, and (5) quality control.

Material handling:This cost pool is for all costs associated with ordering, receiving, and moving materials to the using departments.The number of parts in each Tourist is 15 (i.e., 1 steel tubing issued to Department 1 and 14 assembled components issued to Department 2).Material handling cost is applied to production at the rate $2 per part issued.

Labor-related: This cost pool consists of overhead items such as utilities, equipment depreciation, butane, and indirect materials incurred to support the time consuming activities of cutting, welding, sanding, assembling, and packaging.Labor-related overhead is applied to production in each department at the rate of $12.75 per direct labor hour.

Heat treatement: This cost pool includes utilities and depreciation of the furnace.Heat treatment cost is applied to production at the rate of $54 per treatment hour.Each frame unit requires 30 minutes of heat treatment.

Painting: This cost pool includes the cost of painting frames and depreciation of painting equipment. Painting cost is incurred equally per bicycle and applied to production at the rate of $61.25 per bike.

Quality control: This pool consists of the training cost of factory workers and the salary of factory supervisors and quality control inspectors.Quality control cost is applied to production in each department at the rate of $10.75 per bike inspected.

The information for the fourth quarter (October-December) of the current year is presented below:

Department 1:

Units in Work-in-Process (WIP) inventory, October 1250

Direct materials (steel tubing) costs$19,750, 100% complete

Conversion costs$16,225, 40% complete

(Conversion costs in the beginning inventory are comprised of direct labor, $3,000, and overhead applied, $13,225.)

Units started 2,300

Units completed and transferred to Dept. 22,180

Spoilage units at first inspection (from units started

during the fourth quarter)80

Current costs added/applied during the quarter:

Direct materials (steel tubing) costs$184,000

Direct labor costs$66,480

Overhead applied to production???

Overehad activity measures for the quarter:

Material handling: 2,300 parts

Labor-related: 5,560 direct labor hours

Heat treatment: 1,130 treatment hours

Quality control: ??? bikes inspected

Painting: 2,180 bikes painted

Units in WIP inventory, December 31???

Direct materials (steel tubing) costs100% complete

Conversion costs30% complete

Department 2:

Units in WIP inventory, October 1200

Prior department (Dept. 1) costs $48,600

Direct materials (assembled components) costs$16,200, 70% complete

Conversion costs$5,920, 40% complete

(Conversion costs in the beginning inventory are comprised of direct labor, $1,440, and overhead applied, $4,480.)

Units received from Department 1???

Units completed and transferred to Finished Goods2,100

Spoilage units at second inspection (from units started

during the fourth quarter)100

Current costs added/applied during the quarter:

Prior department (Dept. 1) costs???

Direct materials (assembled components) costs$255,600

Direct labor costs$39,120

Overhead applied to production???

Overhead activity measures for the quarter:

Material handling: 30,100 parts issued

Labor-related: 3,260 direct labor hours

Quality control: ??? bikes inspected

Units in WIP inventory, December 31???

Direct material (assembled components) costs50% complete

Conversion costs30% complete

The production record for the fourth quarter of 2016 indicated that the spoilage units discovered at the first inspection point in Department 1 were considered normal, while those at the second inspection point in Department 2 were considered abnormal spoilage.

The finished goods inventory of Tourist bicycles on October 1 consisted of 250 bikes with a total cost of $107,500.During the fourth quarter, 2,030 bikes were sold at 130 percent of their cost.The firm uses the perpetual inventory record and the first-in-first-out (FIFO) method to determine the balances on both Cost of Goods Sold and Finished Goods Inventory accounts.

Required:

1.Prepare cost reports for the fourth quarter of the year for both production departments.Using the First-In-First-Out (FIFO) method, provide the following figures, with supporting calculations, for each department:

a.Direct materials cost per equivalent unit

b.Conversion cost per equivalent unit

c.Prior department cost per equivalent unit (Note: This requirement applies to Department 2 only.)

d.Total costs assigned to units transferred out

e.Total costs assigned to spoiled units

2.What is the cost of goods sold recognized for the sale? What are the revenues generated during the fourth quarter?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting

Authors: Ray H. Garrison, Eric W. Noreen, Peter C. Brewer

13th Edition

978-0073379616, 73379611, 978-0697789938

More Books

Students also viewed these Accounting questions