Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

IP ADDRESING AND NETWORK DESIGN IP addressing You have been hired by a small company to install a simple LAN for its 7 computers denoted

IP ADDRESING AND NETWORK DESIGN
IP addressing
You have been hired by a small company to install a simple LAN for its 7 computers denoted PC1 to PC7. Develop in Cisco Packet Tracer a simple LAN topology which comprises 1 router and 3 switches. Computers PC1 and PC2 are connected to switch Nr.1, PC3 and PC4 to switch Nr.2, and PC5-PC7 to Nr.3. Switches Nr.2 & 3 are connected through the router.
- Use the network 192.168.20.0/24 to connect and
The gateway IP is: 192.168.20.10
Assign the last usable IP on
Assign the second usable IP on
Explain why those are the second usable IP address and the last usable IP address.
- Use the network 192.168.30.0/24 to connect and
The gateway IP is: 192.168.30.10
Assign the first usable IP on
Assign the last usable IP on
- Use network 192.168.40.0/24 to connect , and
The gateway IP is: 192.168.40.10
Assign the second usable IP on
Assign the first usable IP on after assigning IP of
Assign the last usable IP on
- Use the network 172.78.30.0 for the router and assign the first usable IP to R and select the appropriate mask for this network.
Ping from to , to and to . Provide all screenshots from the ping. Time and TTL should be visible in the screenshot.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Database Processing

Authors: David J. Auer David M. Kroenke

13th Edition

B01366W6DS, 978-0133058352

More Books

Students also viewed these Databases questions

Question

Discuss how to use observation to gather requirements.

Answered: 1 week ago

Question

What are the Five Phases of SDLC? Explain each briefly.

Answered: 1 week ago

Question

How can Change Control Procedures manage Project Creep?

Answered: 1 week ago