Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Job Cost Sheet JOB NO. 469 Quantity 2.000 ITEM White Lion Cages Date Requested 7/2 FOR Todd Company Date Completed 7/31 Direct Materials Direct Labor
Job Cost Sheet JOB NO. 469 Quantity 2.000 ITEM White Lion Cages Date Requested 7/2 FOR Todd Company Date Completed 7/31 Direct Materials Direct Labor Manufacturing Overhead Date 7/10 700 12 900 15 500 600 22 300 360 24 1,720 27 1.580 31 700 840 Cost of completed job: Direct materials Direct labor Manufacturing overhead Total cost Unit cost (1) What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job? Source Documents Direct materials Materials requisition slips Predetermined overhead rate Time tickets Direct labor Manufacturing overhead (2) Overhead is applied on the basis of direct labor cost. What is the predetermined manufacturing overhead rate? Predetermined manufacturing overhead rate % (3) What are the total cost and the unit cost of the completed job? (Round unit cost to 2 decimal places, eg. 1.25.) Total cost of the completed job $ Unit cost of the completed job $ ANSWEILE HOW Yuesto (1) What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job? Source Documents Direct materials Direct labor Materials requisition slips Predetermined overhead rate Time tickets Manufacturing overhead (2) Overhead is applied on the basis of direct labor cost. What is the predetermined manufacturing overhead rate? Predetermined manufacturing overhead rate % (3) What are the total cost and the unit cost of the completed job? (Round unit cost to 2 decimal places, eg. 1.25.) Total cost of the completed job $ $ Unit cost of the completed job List of Accounts (1) What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job? Source Documents Direct materials Direct labor Manufacturing overhead Materials requisition slips Predetermined overhead rate Time tickets (2) Overhead is applied on the basis of direct labor cost. What is the predetermined manufacturing overhead rate? Predetermined manufacturing overhead rate % (3) What are the total cost and the unit cost of the completed job? (Round unit cost to 2 decimal places, eg. 1.25.) Total cost of the completed job $ $ Unit cost of the completed job
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started