Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Lean Six Sigma Need to find ways to lower output percentage 1) giving different lunch breaks to people at different times Selling Price (To Retailer)

image text in transcribed

Lean Six Sigma

Need to find ways to lower output percentage

1) giving different lunch breaks to people at different times

Selling Price (To Retailer) $1,600 Description # Cost Elements (8 in Total) Materials Cost per Mower 1 Mower & It's Parts 2 Plywood Protective Pkg'g 3 Brass Hinges 4 Wooden Pallet Sub Total Mtls $350 $280 $12 $10 $652 Kohler Steel Engine & Steel body w/foam seat 1/2 inch thick plywood 24 Hinges at $.50 each Hardwood Pallet Plant Labor Cost per Mower 5 Mower Assembly Shipping Crate Assembly Total Plant Labor Total DMC $100 $10 $110 $762 Semi-Automated Prod'n Line at 20 per hour Assemble Crate Manually Plant Labor Rate = $25/hr (Same rate for Whse) 7 Warehouse Labor $4 Fork Truck Put Away, Retrieve, Load into Trailer Plant and Warehouse are in "same building" 8 Rounded from $28.57 using $ 1/mi for 1000 miles Transportation (Pre Cowan)* COGS $29 $795 Gross Margin Gross Margin % $805 50% Background Info: Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees (Plt and Whse Labor) = 2 paid 15 min breaks; One 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm. Dept Labor Staffing: There are 2 Production Lines with 8 hourly employees each = 16 employees The Crate Assembly Dept is staffed by 4 employees The Warehouse has 8 employees In Class Assignment: Your Class Team is now a LEAN Team You need to think of ways to eliminate waste" in order to increase OUTPUT per day >>You need to "Quantify" any additional output and how that will be achieved >> ADDITIONAL OUTPUT PER DAY = _Mowers = + % >> YOUR PLAN TO ACHIEVE ADD'L OUTPUT: PRINT TEAM MEMBER'S NAMES WHO WORKED ON DRILL & SIGN YOUR NAME Selling Price (To Retailer) $1,600 Description # Cost Elements (8 in Total) Materials Cost per Mower 1 Mower & It's Parts 2 Plywood Protective Pkg'g 3 Brass Hinges 4 Wooden Pallet Sub Total Mtls $350 $280 $12 $10 $652 Kohler Steel Engine & Steel body w/foam seat 1/2 inch thick plywood 24 Hinges at $.50 each Hardwood Pallet Plant Labor Cost per Mower 5 Mower Assembly Shipping Crate Assembly Total Plant Labor Total DMC $100 $10 $110 $762 Semi-Automated Prod'n Line at 20 per hour Assemble Crate Manually Plant Labor Rate = $25/hr (Same rate for Whse) 7 Warehouse Labor $4 Fork Truck Put Away, Retrieve, Load into Trailer Plant and Warehouse are in "same building" 8 Rounded from $28.57 using $ 1/mi for 1000 miles Transportation (Pre Cowan)* COGS $29 $795 Gross Margin Gross Margin % $805 50% Background Info: Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees (Plt and Whse Labor) = 2 paid 15 min breaks; One 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm. Dept Labor Staffing: There are 2 Production Lines with 8 hourly employees each = 16 employees The Crate Assembly Dept is staffed by 4 employees The Warehouse has 8 employees In Class Assignment: Your Class Team is now a LEAN Team You need to think of ways to eliminate waste" in order to increase OUTPUT per day >>You need to "Quantify" any additional output and how that will be achieved >> ADDITIONAL OUTPUT PER DAY = _Mowers = + % >> YOUR PLAN TO ACHIEVE ADD'L OUTPUT: PRINT TEAM MEMBER'S NAMES WHO WORKED ON DRILL & SIGN YOUR NAME

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions