Question
Makes two products and uses a traditional costing system in which a single plantwide predetermined overhead rate is computed on direct labour hours. Data for
Makes two products and uses a traditional costing system in which a single plantwide predetermined overhead rate is computed on direct labour hours. Data for the two products for the upcoming year follow:
Direct Materials cost per unit | 28.00 | 10.00 |
Direct labour Cost per unit | 5 | 7.4 |
Direct labour hours per unit | 1 | 1.1 |
Number of units produced | 38000 | 90000 |
1. The company's manufacturing overhead costs for the year are expected to be 1644000. Using the company's traditional costing system, compute the unit product costs for the 2 products. Compute the Unit product cost for both.
2. They are considering an activity-based absorption costing system in which half of the overhead would continue based on the direct labour hours and a half would be allocated based on engineering design time. Time is distributed as follow. Compute the unit product costs based on the absorption costing method.
Engineering design time in hours | 9600 | 9600 | 19200 |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started