Question
MIL-STD-105E standard was followed with single sampling plan to inspect items submitted for inspection in lots of size 600. The general inspection level is level
MIL-STD-105E standard was followed with single sampling plan to inspect items submitted for inspection in lots of size 600. The general inspection level is level II and AQL is 0.65%. Following the standard, reduced inspection was used to inspect Lot 11. Inspection results from Lot 11 to Lot 22 are shown in the following table. Lot Number 11 12 13 14 15 16 17 18 19 20 21 22 Number of Defective Items 0 0 1 0 2 1 0 2 1 0 0 0 1) Based on the given MIL-STD-105E switching rules and assume that all required conditions are met, identify the sampling plans (sample size, rejection and acceptance numbers) for inspecting Lots 13, 14, 16, 19 and 21. You may draw the following table in your answer paper and fill up the corresponding information. Lot 13 14 16 19 21 Inspection Type, Normal (N), Tightened (T) or Reduced (R) Sample Size Acceptance number Rejection number Lot Accepted (A) or Rejected (Re) 2) Briefly discuss (do not exceed 0.5 page of a standard A4 paper, double space) 2.1) Possible reasons that the inspections are switched between normal, reduced and tightened 2.2) Possible difficulties and ways to overcome such difficulties in implementing this standard
MIL-STD-105E standard was followed with single sampling plan to inspect items submitted for inspection in lots of size 600. The general inspection level is level II and AQL is 0.65%. Following the standard, reduced inspection was used to inspect Lot 11. Inspection results from Lot 11 to Lot 22 are shown in the following table. 12 13 14 15 19 Lot Number Number of Defective Items 11 0 16 1 17 0 18 2 20 0 21 0 22 0 0 1 0 2 1) Based on the given MIL-STD-105E switching rules and assume that all required conditions are met, identify the sampling plans (sample size, rejection and acceptance numbers) for inspecting Lots 13, 14, 16, 19 and 21. You may draw the following table in your answer paper and fill up the corresponding information. 13 14 16 19 21 Lot Inspection Type, Normal (N), Tightened (T) or Reduced (R) Sample Size Acceptance number Rejection number Lot Accepted (A) or Rejected (Re) 2) Briefly discuss (do not exceed 0.5 page of a standard A4 paper, double space) 2.1) Possible reasons that the inspections are switched between normal, reduced and tightened 2.2) Possible difficulties and ways to overcome such difficulties in implementing this standard MIL-STD-105E standard was followed with single sampling plan to inspect items submitted for inspection in lots of size 600. The general inspection level is level II and AQL is 0.65%. Following the standard, reduced inspection was used to inspect Lot 11. Inspection results from Lot 11 to Lot 22 are shown in the following table. 12 13 14 15 19 Lot Number Number of Defective Items 11 0 16 1 17 0 18 2 20 0 21 0 22 0 0 1 0 2 1) Based on the given MIL-STD-105E switching rules and assume that all required conditions are met, identify the sampling plans (sample size, rejection and acceptance numbers) for inspecting Lots 13, 14, 16, 19 and 21. You may draw the following table in your answer paper and fill up the corresponding information. 13 14 16 19 21 Lot Inspection Type, Normal (N), Tightened (T) or Reduced (R) Sample Size Acceptance number Rejection number Lot Accepted (A) or Rejected (Re) 2) Briefly discuss (do not exceed 0.5 page of a standard A4 paper, double space) 2.1) Possible reasons that the inspections are switched between normal, reduced and tightened 2.2) Possible difficulties and ways to overcome such difficulties in implementing this standardStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started