Margin - Below is a crew make up with rates. Assuming this crew can excavate 575 CY/ HR, determine the total cost of the
Margin - Below is a crew make up with rates. Assuming this crew can excavate 575 CY/ HR, determine the total cost of the operation if your QTO says you need to move 72,000 CY. Assume an 8 hour day. Equipment PU Truck Qty 2 Scrapers 6 Push Cat (Dozer) 1 14 G Motor Grader 1 Labor Oper Foreman Scraper Oper Grade Checker Push Cat Oper Blade Oper General Laborer Subs Water Truck Total 1 6 1 1 2 1 Hourly Rate $10 Total Operation Direct Cost $ $120 $100 $110 590 $85 $80 $83 588 $68 130 1. Determine the total direct cost of this operation Total Cy to Move 72,000 Total Crew Hours at 575 CV/ Crew Hour = Total Crew Cost per Hour S Category Equipment Equipment Equipment Equipment Sub Total Equipment Labor Labor Labor Labor Labor Labor Sub Total Labor Subcontractors Crew Hours Cost
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started