NAME PV EV AC SV CV BAC EAC Scanner Project 420 395 476 -25 -81 915 1128 H 1.0 Hardware 92 88 260 243 H

image text in transcribed
NAME PV EV AC SV CV BAC EAC Scanner Project 420 395 476 -25 -81 915 1128 H 1.0 Hardware 92 88 260 243 H 1.1 Hardware Specifications (DS) 20 20 20 15 H 1.2 Hardware Design (DS) 30 30 25 H 1.3 Hardware Documentation (DOC) 10 10 8 ooooboob H 1.4 Prototype (PD) 40 40 H 1.5 Test Prototypes (T) 0 30 30 H 1.6 Order Circuit Boards (PD) 30 30 30 25 H 1.7 Preproduction Models (PD) 100 100 OP 1.0 Operating System 195 150 196 -46 330 480 OP 1.1 Kernel Specifications (DS) 20 20 15 OP 1.2 Drivers 55 OP 1.2.1 Disk Drivers (DEV) 25 OP 1.2.2 1/O Drivers ( OP 1.3 Code Software 130 105 24 368 OP 1.3.1 Code Software ( C ) 30 OP 1.3.2 Document Software (DOC) 45 OP 1.3.3 Code Interfaces ( C ) 65 OP 1.3.4 Beta-Test Software (T) 0 U 1.0 Utilities 87 108 260 U 1.1 Utilities Specifications (DS) 20 20 U 1.2 Routine Utilities (DEV) 20 20 U 1.3 Complex Utilities (DEV) 30 60 U 1.4 Utilities Documentation (DOC) 17 U 1.5 Beta-Test Utilities (T) S 1.0 System Integration 46 49 S 1.1 Architecture Decisions (DS) S 1.2 Integration Hard/Soft (DEV) 25 30 ONDUNG ONONOW S 1.3 System Hardware/Software Test (T) S 1.4 Project Documentation (D)C 12 10 S 1.5 Integration Acceptance Testing (T) Note: There are minor errors in the Larson & Gray (2013) table. These appear to be found only in the EAC column. They are corrected here. You have been serving as Electroscan's project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to date and at completion. Be as specific as you can using numbers given and those you might develop. Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status and future status of the project, and your recommended changes (if any). Calculate EVM information from the data provided using the Electroscan, Inc. Student Table spreadsheet and then draw conclusions regarding the status of the project in the case study Draw conclusions regarding project health from the Earned Value analysis. Analyze the effects of given schedule variances as well as SPI, CPI, EAC, TCIP, and any other EVM analytical products they deem valuable

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Management

Authors: Cornelius A. De Kluyver

1st Edition

1631570730, 978-1631570735

More Books

Students also viewed these General Management questions