Question
Overhead information for Cran-Mar Company for October follows: Total factory overhead cost incurred $ 16,700 Budgeted fixed factory overhead cost $ 4,902 Total standard overhead
Overhead information for Cran-Mar Company for October follows:
Total factory overhead cost incurred | $ 16,700 |
---|---|
Budgeted fixed factory overhead cost | $ 4,902 |
Total standard overhead rate per machine hour (MH) | $ 4.95 |
Standard variable factory overhead rate per MH | $ 3.50 |
Standard MHs allowed for the units manufactured | 4,850 |
Required:
1. What is the standard fixed factory overhead rate per machine hour (MH)?
2. What is the denominator activity level that was used to establish the fixed factory overhead application rate?
3. Two-way analysis (breakdown) of the total factory overhead cost variance: calculate the following factory overhead cost variances for October and indicate whether each variance is favorable (F) or unfavorable (U).
a. Total flexible-budget variance.
b. Production volume variance.
c. Total overhead cost variance.
4. Calculate the production volume variance and indicate whether the variance is favorable (F) or unfavorable (U).
Required 1 Required 2 Required 3 Required 4 What is the standard fixed factory overhead rate per machine hour (MH)? (Round your answer to 2 decimal places.) Standard fixed factory overhead rate per MH Required 1 Required 2 Required 3 Required 4 What is the denominator activity level that was used to establish the fixed factory overhead application rate? (Round your answer to the nearest whole number.) Denominator activity level MH Required 1 Required 2 Required 3 Required 4 Two-way analysis (breakdown) of the total factory overhead cost variance: calculate the following factory overhead cost variances for October and indicate whether each variance is favorable (F) or unfavorable (U). a. Total flexible-budget variance b. Production volume variance c. Total overhead cost variance Required 1 Required 2 Required 3 Required 4 Calculate the production volume variance and indicate whether the variance is favorable (F) or unfavorable (U). Production volume varianceStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started