Answered step by step
Verified Expert Solution
Question
1 Approved Answer
pick GE 9HA.01 gas turbine manufacture catalogue and solve all this part Open Ended Design Problem: Design and select (from Manufacturer Catalogue i.e., GE, Siemen
pick GE 9HA.01 gas turbine manufacture catalogue and solve all this part
Open Ended Design Problem: Design and select (from Manufacturer Catalogue i.e., GE, Siemen etc) a Gas turbineCombined cycle power plant that has a combined output of 8001300MW (select any of your output) and can achieve a cycle thermal efficiency of at least 60 percent, with a heating rate of not more than 5900kJ/kWh. Prepare an engineering report ( 1015 pages) describing your design. Your design report must include, but is not limited to, the following: a) Discussion of various cycles/configuration attempted to meet the goal as well as the positive and negative aspects of your design. b) System figures and T-s diagrams with labelled states and temperature, pressure, enthalpy, and entropy information for your design. Sample calculations. c) Total Gas Consumption (MMBTU) for your design. The Cost of Gas in ( $/MWh ) both Tax Inclusive and exclusive, for the Indigenous gas at Rs. 629 per MMBTU, Rs. 1022 MMBTU, and RLNG Tariff (i.e @ Rs 1700 per MMBtu). d) Total Levelized Cost ( $/MWh ) and in (PKR/kWh), if Non-Fuel O\&M Cost is taken as $3.50, and Capital Return is $21.24Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started